ANALISIS PENINGKATAN KAPASITAS PEMBANGKIT LISTRIK TENAGA PIKOHIDRO (PLTPh) CIHANJUANG CIMAHI DENGAN MENDESAIN ULANG PLTPH EXISTING

M. Fahri Hermawan, - (2021) ANALISIS PENINGKATAN KAPASITAS PEMBANGKIT LISTRIK TENAGA PIKOHIDRO (PLTPh) CIHANJUANG CIMAHI DENGAN MENDESAIN ULANG PLTPH EXISTING. S1 thesis, Universitas Pendidikan Indonesia.

[img] Text
S_TE_1704659_Title.pdf

Download (251kB)
[img] Text
S_TE_1704659_Chapter1.pdf

Download (50kB)
[img] Text
S_TE_1704659_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (561kB)
[img] Text
S_TE_1704659_Chapter3.pdf

Download (393kB)
[img] Text
S_TE_1704659_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (885kB)
[img] Text
S_TE_1704659_Chapter5.pdf

Download (43kB)
[img] Text
S_TE_1704659_Appendix.pdf
Restricted to Staf Perpustakaan

Download (518kB)
Official URL: http://repository.upi.edu

Abstract

Mengingat kebutuhan energi listrik yang terus meningkat, dibutuhkan sebuah energi alternatif dari sumber daya yang tersedia. Salah satu solusinya adalah membuat Pembangkit Listrik Tenaga Pikohidro (PLTPh) dimana memanfaatkan aliran air sungai sebagai sumber utama penggerak turbin. Penelitian ini, merupakan sebuah analisis dari sebuah PLTPh yang sudah ada di Cihanjuang Cimahi untuk menspulai kebutuhan listrik warga Desa Cihanjuang Babut gang Irigasi RT 03 dan melakukan perancangan ulang terhadap PLTPh agar PLTPh ini dapat memenuhi kebutuhan listrik warga Desa Cihanjuang Babut gang Irigasi RT 03. Penelitian ini menggunakan metode analisis deskriptif dengan menggunakan beberapa perhitungan matematis. Beberapa faktor utama yang memengaruhi besarnya energi listrik yang dihasilkan oleh PLTPh adalah debit air, tinggi jatuh air, efisiensi turbin dan efisiensi generator. Hasil yang didapatkan dari penelitian ini adalah perlu diadakannya perubahan komponen-komponen dari PLTPh yang berfokus pada turbin dan generator yang diubah menjadi turbin crossflow dan menggunakan generator dengan kapasitas 11.09 kW. Diharapkan dari penelitian ini dapat menjadi bahan literasi dan rujukan untuk sebuah perusahaan atau pemerintah apabila ingin mendesain sebuah PLTPh di suatu tempat. Kata Kunci: PLTPh, Turbin, Generator, Potensi Daya Remembering the increasing demand for electrical energy, an alternative energy from the available resources is needed to complete the demand for electrical energy. One of the solution is to make Picohydro Power Plant (PHPP) which utilizes river water as the main source of turbine propulsion. This research is an analysis of an exist PHPP in Cihanjuang Cimahi to supply the electrical needs of the residents of Cihanjuang Babut Village gg Irigasi RT 03 and redesign the PHPP so this PHPP can supply the electricity needs of the residents of Cihanjuang Babut Village gg Irigasi RT 03. This research uses descriptive analysis method using several mathematical calculations. The main factors for the amount of electrical energy which produced by PHPP are water discharge, water fall height, turbine efficiency and generator efficiency. The results obtained from this research is necessary to chate the components of the PHPP which focuses on turbine and generator that changed into crossflow turbine and generator with a capacity of 11.09 kW. And hoped this research can be a literacy and reference for a company or government if they want to design a PHPP in another place. Key Words: PHPP, Turbine, Generator, Power Potential

Item Type: Thesis (S1)
Uncontrolled Keywords: PLTPh, Turbin, Generator, Potensi Daya
Subjects: L Education > L Education (General)
T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Elektro
Depositing User: Muhammad Fahri Hermawan
Date Deposited: 06 Sep 2021 02:06
Last Modified: 06 Sep 2021 02:06
URI: http://repository.upi.edu/id/eprint/65685

Actions (login required)

View Item View Item