PEMBUATAN KONTRUKSI RANGKA CURCIBLE UNTUK TUNGKU PENUANGAN TUNGKIK UNTUK KAPASITAS 10 KG

Anjar Nugraha, - (2019) PEMBUATAN KONTRUKSI RANGKA CURCIBLE UNTUK TUNGKU PENUANGAN TUNGKIK UNTUK KAPASITAS 10 KG. D3 thesis, Universitas Pendidikan Indonesia.

[img] Text
TA_TM_1502120_Tittle.pdf

Download (534kB)
[img] Text
TA_TM_1502120_Chapter1.pdf

Download (288kB)
[img] Text
TA_TM_1502120_Chapter2.pdf

Download (1MB)
[img] Text
TA_TM_1502120_Chapter3.pdf

Download (715kB)
[img] Text
TA_TM_1502120_Chapter4.pdf

Download (551kB)
[img] Text
TA_TM_1502120_Chapter5.pdf

Download (184kB)
Official URL: http://repository.upi.edu

Abstract

Penyusunan Tugas Akhir (TA) ini bertujuan untuk membuat sebuah alat bantu rangka crucible untuk tungku penuangan tungkik di workshop FPTK UPI, serta untuk memperoleh gambaran nyata tentang waktu dan biaya yang dibutuhkan dalam pembuatan kontruksi rangka curcible. Pembuatan kontruksi ini menggunakan bahan ST37. Proses pembuatan komponen ini dilakukan melalui: 1) Proses hand grinding; 2) Proses drilling; 3) Proses las SMAW. Secara teoritis waktu yang dibutuhkan 3,68 jam dengan total biaya Rp.611.255,00 (termasuk biaya material). Adapun secara realistis waktu yang diperlukan adalah 4,51 jam dengan total biaya Rp. 1.024.300,00 (termasuk biaya material). Kata kunci: Kontruksi crucible untuk tungku penuangan tungkik, Proses drilling, Proses las SMAW ST37. The purpose of this Final Assignment (TA) is to create a tool for the framework of the crucible for the tipping pouring furnace in the FPTK UPI workshop, and to obtain a real picture of the time and costs needed in making curcible frame construction. This construction uses ST37 material. The process of making these components is done through: 1) Hand grinding process; 2) Drilling process; 3) SMAW welding process. Theoretically the time needed is 3.68 hours with a total cost of Rp.611,255.00 (including material costs). As for realistically the time needed is 4.51 hours with a total cost of Rp. 1,024,300.00 (including material costs). Keywords: Crucible construction for tipping pouring furnaces, drilling process, SMAW ST37 welding process.

Item Type: Thesis (D3)
Additional Information: No. Panggil : TA TM ANJ p-2018; Pembimbing : I. Wardaya; NIM. :1505399.
Uncontrolled Keywords: Crucible construction for tipping pouring furnaces, drilling process, SMAW ST37 welding process, Kontruksi crucible untuk tungku penuangan tungkik, Proses drilling, Proses las SMAW ST37.
Subjects: L Education > L Education (General)
T Technology > T Technology (General)
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Mesin > Program D3 Teknik Mesin
Depositing User: anjar nugraha
Date Deposited: 13 May 2019 04:55
Last Modified: 13 May 2019 04:55
URI: http://repository.upi.edu/id/eprint/35009

Actions (login required)

View Item View Item