PEMBUATAN FIXTURE DENGAN ENAM PEGANGAN UNTUK PROSES PEMBUATAN LOCK HOLE STEERING SHAFT

Izata, Makmum Ahmad (2017) PEMBUATAN FIXTURE DENGAN ENAM PEGANGAN UNTUK PROSES PEMBUATAN LOCK HOLE STEERING SHAFT. eprint_fieldopt_thesis_type_Diploma thesis, Universitas Pendidikan Indonesia.

[img] Text
T_TM_1405392_Title.pdf

Download (347kB)
[img] Text
T_TM_1405392_Abstract.pdf

Download (227kB)
[img] Text
T_TM_1405392_Table_of_content.pdf

Download (393kB)
[img] Text
T_TM_1405392_Chapter1.pdf

Download (320kB)
[img] Text
T_TM_1405392_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (1MB)
[img] Text
T_TM_1405392_Chapter3.pdf

Download (2MB)
[img] Text
T_TM_1405392_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (58kB)
[img] Text
T_TM_1405392_Bibliography.pdf

Download (135kB)
[img] Text
T_TM_1405392_Appendix.pdf
Restricted to Staf Perpustakaan

Download (139kB)
Official URL: http://repository.upi.edu

Abstract

Penyusunan Tugas Akhir (TA) ini bertujuan untuk melakukan improvement di lini produksi Steering Shaft, serta untuk memperoleh gambaran nyata tentang waktu dan biaya yang dibutuhkan dalam pembuatan Fixture tersebut. Pembuatan Fixture ini menggunakan material ST37 agar memiliki karakteristik yang sesuai dengan proses produksi. Proses pembuatan komponen ini dilakukan melalui: 1) Proses frais; 2) proses fitter;. Secara teoritis waktu yang dibutuhkan adalah 24.67 jam dengan total biaya Rp. 8.686.850 (termasuk biaya material). Adapun secara realistis waktu yang diperlukan adalah 26.54 jam dengan total biaya Rp 9.277.700 (termasuk biaya material).-------------------- The final drafting (TA) is aimed at improving the Steering Shaft production line, as well as to get a real picture of the time and cost required in making the Fixture. Making this Fixture using ST37 material to have characteristics in accordance with the production process. The process of making this component is done through: 1) Process frais; 2) fitter process ;. Theoretically the time required is 24.67 hours with total cost Rp. 8,686,850 (including material costs). The realistic time required is 26.54 hours with total cost Rp 9.277.700 (including material costs).

Item Type: Thesis (eprint_fieldopt_thesis_type_Diploma)
Additional Information: No. Panggil :TTM IZA p-2017 ; Pembimbing : I.Yayat; NIM : 1405392
Uncontrolled Keywords: Steering Shaft, Fixture, ST37,
Subjects: T Technology > TJ Mechanical engineering and machinery
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Mesin > Program D3 Teknik Mesin
Depositing User: Mr Herli Bahtiar
Date Deposited: 28 Aug 2018 02:30
Last Modified: 28 Aug 2018 02:30