ECONOMIC DISPATCH METODE ITERASI LAMBDA PEMBANGKIT THERMAL INTERKONEKSI JAWA-BALI DENGAN BEBAN LISTRIK HARI LIBUR NASIONAL BERBASIS FEED FORWARD BACK-PROPAGATION

Khansa Ratri Haniya, - (2019) ECONOMIC DISPATCH METODE ITERASI LAMBDA PEMBANGKIT THERMAL INTERKONEKSI JAWA-BALI DENGAN BEBAN LISTRIK HARI LIBUR NASIONAL BERBASIS FEED FORWARD BACK-PROPAGATION. S1 thesis, Universitas Pendidikan Indonesia.

[img] Text
S_TE_1504417_Title.pdf

Download (514kB)
[img] Text
S_TE_1504417_Chapter1.pdf

Download (402kB)
[img] Text
S_TE_1504417_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (506kB)
[img] Text
S_TE_1504417_Chapter3.pdf

Download (516kB)
[img] Text
S_TE_1504417_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (1MB)
[img] Text
S_TE_1504417_Chapter5.pdf

Download (176kB)
[img] Text
S_TE_1504417_Appendix.pdf
Restricted to Staf Perpustakaan

Download (959kB)
Official URL: http://repository.upi.edu

Abstract

ABSTRAK Setiap pembangkit thermal memiliki biaya bahan bakar dan heat rate yang menentukan segi ekonomis suatu pembangkit. Untuk meminimalisasi biaya operasi pembangkit tersebut, dapat dilakukan optimisasi menggunakan Economic Dispatch, sehingga dicapai biaya operasi yang paling optimal. Dalam penelitian ini, digunakan metode Iterasi Lambda. Biasanya, beban yang digunakan adalah beban listrik harian, namun dalam penelitian ini, digunakan beban listrik anomali, yaitu beban listrik hari libur nasional yang telah mengalami proses forecasting menggunakan metode Feed Forward Back-Propagation. Hasil yang didapat menunjukkan adanya penghalusan pada grafik beban anomali, sehingga memengaruhi biaya operasi pembangkitan. ABSTRACT Each thermal generator has a fuel cost and heat rate that determines the economic aspects of a generator. To minimize the cost of operating the generator unit, optimization can be done using Economic Dispatch, so that the most optimal operating costs are achieved. In this study, the Lambda Iteration method was used. Normally, the load used as research object is the daily electric load, but in this research, the load used id the anomaly load, which is the load of national holidays that had been forecasted using Feed Forward Back Propagation method. The result obtained shows that there is smoothing on anomaly load curve, so that affects the operation cost of plant.

Item Type: Thesis (S1)
Additional Information: No. Panggil: S TE KHA e-2019 ; Pembimbing: I. Ade Gaffar Abdullah, II. Dadang Lukman ; NIM: 1504417
Uncontrolled Keywords: optimalisasi; Economic Dispatch; Iterasi Lambda; Short Term Forecasting; Feed Forward Back-Propagation
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Elektro > Program Studi Teknik Tenaga Elektrik
Depositing User: Khansa Ratri Haniya
Date Deposited: 03 Jan 2020 02:38
Last Modified: 03 Jan 2020 02:38
URI: http://repository.upi.edu/id/eprint/38540

Actions (login required)

View Item View Item