PERENCANAAN INSTALASI LISTRIK SENTRALAND SEMARANG

Yunita, Husni (2017) PERENCANAAN INSTALASI LISTRIK SENTRALAND SEMARANG. D3 thesis, Universitas Pendidikan Indonesia.

[img] Text
TA_TE_1205654_Title.pdf

Download (26kB)
[img] Text
TA_TE_1205654_Abstract.pdf

Download (133kB)
[img] Text
TA_TE_1205654_Table_Of_Content.pdf

Download (216kB)
[img] Text
TA_TE_1205654_Chapter1.pdf

Download (121kB)
[img] Text
TA_TE_1205654_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (609kB)
[img] Text
TA_TE_1205654_Chapter3.pdf

Download (301kB)
[img] Text
TA_TE_1205654_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (578kB)
[img] Text
TA_TE_1205654_Chapter5.pdf

Download (132kB)
[img] Text
TA_TE_1205654_Bibliography.pdf

Download (152kB)
Official URL: http://repository.upi.edu

Abstract

Mendesain instalasi listrik sebuah gedung diperlukan perencanaan yang baik. Hal ini dikarenakan sebuah desain instalasi yang baik harus memenuhi prinsip aman, handal, mudah, ramah lingkungan, ekonomis dan keindahan. Dengan menunjang prinsip tersebut maka sistem instalasi yang direncanakan dapat beroperasi dengan optimal dan handal. Gedung Sentraland Semarang sebagai objek yang dijadikan perencanaan, akan dibangun sebagai tempat hunian. Untuk menunjang semua aktivitas dalam gedung, dibutuhkan perencanaan desain instalasi listrik yang baik terutama instalasi listrik penerangan. Perencanaan diawali dengan melakukan perhitungan teknis terkait tingkat penerangan, jumlah titik cahaya serta kebutuhan beban. Perencanaan yang akan penulis lakukan mengacu pada PUIL 2000, SNI 03-6575-2001 (Tata Cara Perancangan Sistem Pencahayaan) sebagai acuan dalam rekapitulasi daya dan kebutuhan penerangan. Dari hasil perencanaan didapat bahwa kebutuhan daya pada gedung ini sebesar 287,611 kW dengan sistem distribusi daya 3 fasa. Hasil perencanaan ini pula dapat dijadikan acuan dalam proses pembangunan gedung oleh pihak kontraktor dan teknisi lapangan.;---Design electricity installation a building required planning good. It was because a design installation good must meet the principle safe, reliable, easy, environmentally friendly, economical and beauty. With support that principle then the system installation planned can operate optimally and reliable. Building sentraland semarang as an object used as planning, will be built as a occupancy. To support all activities in the building, needed planning design electricity installation especially of good electricity installation lighting. Planning started by cleaning calculation relevant technical level lighting, the number of a point of light and needs of the burden. Planning will writer do referring to puil 2000, sni 03-6575-2001 (procedures design system lighting) as a reference in recapitulation resources and needs lighting. From the planning obtained that the needs the power on building is 287,611 kW with the system in.

Item Type: Thesis (D3)
Additional Information: No. Panggil : TA TE YUN p-2017; Pembimbing : I. I Wayan Ratnata, II. Elih Mulyana; NIM : 1205654.
Uncontrolled Keywords: instalasi listrik, perencanaan, sentraland semarang, Electrical Installation, Planning, Sentraland Semarang.
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Elektro > Program D3 Teknik Elektro
Depositing User: DAM staf
Date Deposited: 03 Dec 2018 07:00
Last Modified: 03 Dec 2018 07:00
URI: http://repository.upi.edu/id/eprint/32411

Actions (login required)

View Item View Item