PEMBUATAN KONTRUKSI ALAT BANTU PENGELASAN PIPA

Maulana, Rizal (2017) PEMBUATAN KONTRUKSI ALAT BANTU PENGELASAN PIPA. eprint_fieldopt_thesis_type_Diploma thesis, Universitas Pendidikan Indonesia.

[img] Text
T_TM_1404481_Title.pdf

Download (234kB)
[img] Text
T_TM_1404481_Abstract.pdf

Download (109kB)
[img] Text
T_TM_1404481_table_of-content.pdf

Download (496kB)
[img] Text
T_TM_1404481_Chapter1.pdf

Download (203kB)
[img] Text
T_TM_1404481_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (918kB)
[img] Text
T_TM_1404481_Chapter3.pdf

Download (893kB)
[img] Text
T_TM_1404481_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (135kB)
[img] Text
T_TM_1404481_Bibliography.pdf

Download (129kB)
[img] Text
T_TM_1404481_Appendix.pdf
Restricted to Staf Perpustakaan

Download (68kB)
Official URL: http://repository.upi.edu

Abstract

Penyusunan Tugas Akhir (TA) ini bertujuan untuk pembuat sebuah alat bantu pengelasan pipa dengan posisi pengelasan 1G, 2G, dan 6G, yang belum terlaksana di workshop FPTK UPI, serta untuk memperoleh gambaran nyata tentang waktu dan biaya yang dibutuhkan dalam pembuatan kontruksi alat bantu pengelasan pipa. Pembuatan kontruksi ini menggunkan bahan ST37. Proses pembuatan komponen ini dilakukan melalui: 1) Proses hand grinding; 2) Proses drilling; 3) Proses las SMAW. Secara teoritis waktu yang dibutuhkan 3,46jam dengan total biaya Rp. 598.200,00 (termasuk biaya material). Adapun secara realistis waktu yang diperlukan adalah 5,38 jam dengan total biaya Rp. 704.000,00 (termasuk biaya material).-------------- This Final Project (TA) is aimed at creating a pipe welding tool with 1G, 2G, and 6G welding position, which has not been done in UPI FPTK workshop, and to get a real picture about the time and cost required in making the construction of welding aids pipe. Making this construction using ST37 material. The process of making this component is done through: 1) Hand grinding process; 2) Drilling process; 3) SMAW welding process. Theoretically the time required 3.46jam with total cost Rp. 598.200,00 (including material costs). The realistic time required is 5.38 hours with a total cost of Rp. 704,000.00 (including material cost).

Item Type: Thesis (eprint_fieldopt_thesis_type_Diploma)
Additional Information: No. Panggil :T TM MAU p-2017 ; Pembimbing : IAsep Hadian Sasmita; NIM:
Uncontrolled Keywords: Kontruksi alat bantu pengelasan pipa, posisi pengelasan, ST37,Construction of pipe welding tools, welding position, ST37.
Subjects: T Technology > TJ Mechanical engineering and machinery
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Mesin > Program D3 Teknik Mesin
Depositing User: Mr Herli Bahtiar
Date Deposited: 28 Aug 2018 01:26
Last Modified: 28 Aug 2018 01:26
URI: http://repository.upi.edu/id/eprint/31238

Actions (login required)

View Item View Item