EVALUASI PEMANFAATAN AIR WADUK SAGULING PROVINSI JAWA BARAT

Amalia, Siti Maryam (2015) EVALUASI PEMANFAATAN AIR WADUK SAGULING PROVINSI JAWA BARAT. S1 thesis, Universitas Pendidikan Indonesia.

[img]
Preview
Text
S_TB_1100365_Title.pdf

Download (160kB) | Preview
[img]
Preview
Text
S_TB_1100365_Abstract.pdf

Download (210kB) | Preview
[img]
Preview
Text
S_TB_1100365_Table_of_content.pdf

Download (259kB) | Preview
[img]
Preview
Text
S_TB_1100365_Chapter1.pdf

Download (220kB) | Preview
[img] Text
S_TB_1100365_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (1MB)
[img]
Preview
Text
S_TB_1100365_Chapter3.pdf

Download (383kB) | Preview
[img] Text
S_TB_1100365_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (7MB)
[img]
Preview
Text
S_TB_1100365_Chapter5.pdf

Download (141kB) | Preview
[img]
Preview
Text
S_TB_1100365_Bibliography.pdf

Download (72kB) | Preview
[img] Text
S_TB_1100365_Appendix.pdf
Restricted to Staf Perpustakaan

Download (8MB)
Official URL: http://repository.upi.edu

Abstract

Pertambahan penduduk di berbagai kota terjadi semakin pesat, dengan adanya pertambahan penduduk berdampak pada kebutuhan air baku yang ikut meningkat. Selain kebutuhan air baku yang meningkat kebutuhan akan pangan juga ikut bertambah hal ini berpengaruh terhadap kebutuhan air untuk irigasi. Peningkatan kebutuhan air baku dan kebutuhan air untuk irigasi tidak diiringi dengan penambahan sumber air sehingga, sumber air yang ada diharapkan dapat memenuhui semua kebutuhan. Karena jumlah sumber air tetap maka diperlukan penampungan air berupa waduk. Didaerah Jawa Barat sendiri terdapat beberapa Waduk diantaranya adalah Waduk Saguling yang memiliki fungsi utama sebagai pembangkit tenaga listrik dengan membuat Pusat Listrik Tenaga Air (PLTA) sebesar 700MW (4x175MW). Energi listrik yang dibangkitkan sebesar 2.156 GWh. rata-rata tiap tahun. Penelitia ini dibuat bertujuan untuk mengetahui Waduk Saguling terjadi surplus jika digunakan untuk produksi listrik yang terbaru dan untuk mengetahui kemampuan waduk Saguling melayani kebutuhan air baku dan irigasi jika masih terdapat air sisa. Perhitungan menggunakan metode periode kritik (simulasi) dengan bantuan Microsotf Excel. Hasil penelitian menunjukan, pada delapan simulasi untuk beberapa tahun mendatang Waduk Saguling mampu memenuhi kebutuhan tambahan air baku Kota Cimahi serta Irigasi Kecamatan Ngamprah dan Kecamatan Cipatat dengan kondisi produksi listrik 2.356.941Mwh/Tahun (rencana produksi = 2.156.000 Mwh/Tahun; produksi rata-rata tahun 1986 – tahun 2014 = 2.386.639 Mwh/Tahun). Kata kunci : Waduk Saguling, PLTA, air baku, irigasi, operasi waduk. Advanced growth population in cities happened so rapidly, with the population growth impact on the domestic water demand. In addition the demand for food also increases this effect on water demand for irrigation. Increased raw water needs and water requirements for irrigation are not accompanied by the the addition of water resources so the existing water sources are expected to fulfill all needs. Because of the steady volume from water source,water storage reservoir is needed. In West Java alone there are several reservoirs, one of them are Saguling whose main function is to generate electricity by making the Central Water Power (hydropower) amounted to 700MW (4x175MW). The electrical energy generated by 2,156 GWh. on average each year. This research aims to determine Saguling water storage whether surplus, if it is used for present electricity production. Also to determine the ability to serve the needs of domestic water adn irrigation if there are any residual water. Calculation used in this research is Critical period techniques (simulation) with the help of Microsoft Excel. The results showed, that eight simulation for the next few years Saguling is capable of serving the needs of domestic water of Cimahi (city) and the needs of irrigation in Ngamprah District and Cipatat District with electricity production conditions 2.356.941Mwh / year (production plan = 2.156.000 MWh / year; production an average of 1986 - 2014 = 2,386,639 MWh / year). Keywords: Saguling Dam, hydropower, domestic water, irrigation, reservoir operation.

Item Type: Thesis (S1)
Additional Information: No. Panggil : S TB AMA e-2015; Pembimbing : I. Sukadi, II. Rakhmat Yusuf
Uncontrolled Keywords: Waduk Saguling, PLTA, air baku, irigasi, operasi waduk.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Sipil > Program Studi Teknik Sipil
Depositing User: Mrs. Neni Sumarni
Date Deposited: 25 May 2016 04:41
Last Modified: 25 May 2016 04:41
URI: http://repository.upi.edu/id/eprint/20097

Actions (login required)

View Item View Item