ANALISIS RISIKO KECELAKAAN KERJA PADA PEKERJAAN STRUKTUR ATAS PROYEK PEMBANGUNAN GEDUNG BERTINGKAT MENGGUNAKAN METODE IBPRP

    Virgi Irgiansyah, - and Dewi Yustiarini, - and Naufal Ariq Pratama, - (2025) ANALISIS RISIKO KECELAKAAN KERJA PADA PEKERJAAN STRUKTUR ATAS PROYEK PEMBANGUNAN GEDUNG BERTINGKAT MENGGUNAKAN METODE IBPRP. S1 thesis, Universitas Pendidikan Indonesia.

    Abstract

    Sektor konstruksi di Indonesia menghadapi tantangan serius terkait Keselamatan dan Kesehatan Kerja (K3), dengan kontribusi signifikan terhadap total kecelakaan kerja nasional. Pekerjaan struktur atas di gedung tingkat tinggi memiliki risiko tinggi karena kompleksitasnya. Penelitian ini bertujuan untuk mengidentifikasi, menilai, dan mengendalikan risiko kecelakaan kerja pada pekerjaan struktur atas di Proyek pembangunan Learning Center Bank Tabungan Negara Dago Pakar, Bandung. Studi ini menggunakan metode deskriptif kuantitatif dengan pendekatan Analisis Identifikasi Bahaya, Penilaian Risiko, Penentuan Pengendalian Risiko, dan Peluang (IBPRP), sesuai dengan Permen PUPR No. 10 Tahun 2021. Data primer diperoleh melalui wawancara dengan responden ahli dan pekerja, serta data sekunder dari studi literatur dan dokumen proyek. Hasil menunjukkan 21 aktivitas pekerjaan struktur atas, dengan 50 variabel risiko tergolong tinggi dan 48 sedang. Pengendalian risiko awal meliputi rekayasa teknis (pengamanan), administrasi (SOP, pelatihan, inspeksi), dan penggunaan Alat Pelindung Diri (APD) seperti helm, sepatu, sarung tangan, dan body harness. Penelitian ini menegaskan pentingnya IBPRP untuk mengelola risiko konstruksi. Disarankan studi lebih lanjut untuk mengeksplorasi variabel risiko spesifik, peran pekerja di K3, dan meningkatkan pengawasan terhadap pekerja. The construction sector in Indonesia faces serious challenges related to Occupational Safety and Health (OHS), with a significant contribution to the national total of work accidents. The superstructure works in high-rise buildings have high risks due to their complexity. This study aims to identify, assess, and control the risk of work accidents in the superstructure work at the Learning Center Development Project of Bank Tabungan Negara Dago Pakar, Bandung. This study uses a quantitative descriptive method with the Hazard Identification Analysis, Risk Assessment, Risk Control Determination, and Opportunity (IBPRP) approach, in accordance with the Minister of PUPR Regulation No. 10 of 2021. The first data was obtained through interviews with expert respondents and workers, as well as secondary data from literature studies and project documents. The results showed 21 upper structure work activities, with 50 risk variables classified as high and 48 as medium. Initial risk controls included engineering (safeguards), administration (SOPs, training, inspections), and the use of Personal Protective Equipment (PPE) such as helmets, shoes, gloves, and body harnesses. This study confirms the importance of IBPRP to manage construction risks. Further studies are recommended to explore specific risk variables, the role of workers in OHS, and improve supervision of workers.

    [thumbnail of S_TS_2107997_Title.pdf] Text
    S_TS_2107997_Title.pdf

    Download (1MB)
    [thumbnail of S_TS_2107997_Chapter 1.pdf] Text
    S_TS_2107997_Chapter 1.pdf

    Download (270kB)
    [thumbnail of S_TS_2107997_Chapter 2.pdf] Text
    S_TS_2107997_Chapter 2.pdf
    Restricted to Staf Perpustakaan

    Download (1MB)
    [thumbnail of S_TS_2107997_Chapter 3.pdf] Text
    S_TS_2107997_Chapter 3.pdf

    Download (533kB)
    [thumbnail of S_TS_2107997_Chapter 4.pdf] Text
    S_TS_2107997_Chapter 4.pdf
    Restricted to Staf Perpustakaan

    Download (1MB)
    [thumbnail of S_TS_2107997_Chapter 5.pdf] Text
    S_TS_2107997_Chapter 5.pdf

    Download (252kB)
    [thumbnail of S_TS_2107997_Appendix.pdf] Text
    S_TS_2107997_Appendix.pdf
    Restricted to Staf Perpustakaan

    Download (3MB)
    Official URL: https://repository.upi.edu/
    Item Type: Thesis (S1)
    Additional Information: ID SINTA Dosen Pembimbing: Dewi Yustiarini : NIDN5999919 Naufal Ariq Pratama : NIDN6963780
    Uncontrolled Keywords: Analisis Risiko, Kecelakaan Kerja, IBPRP, Keselamatan Konstruksi Risk Analysis, Work Accident, IBPRP, Construction Safety
    Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
    R Medicine > R Medicine (General)
    T Technology > T Technology (General)
    T Technology > TH Building construction
    Divisions: Fakultas Pendidikan Teknik dan Industri > Jurusan Pendidikan Teknik Sipil > Program Studi Teknik Sipil
    Depositing User: Virgi Irgiansyah
    Date Deposited: 21 Oct 2025 02:14
    Last Modified: 21 Oct 2025 02:14
    URI: http://repository.upi.edu/id/eprint/143760

    Actions (login required)

    View Item View Item