RANCANG BANGUN SIMULATOR PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (PLTMH)

Setiawan, Dede Idam (2014) RANCANG BANGUN SIMULATOR PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (PLTMH). S1 thesis, Universitas Pendidikan Indonesia.

[img]
Preview
Text
S_TE_1000268_Title.pdf

Download (269kB) | Preview
[img]
Preview
Text
S_TE_1000268_Abstract.pdf

Download (187kB) | Preview
[img]
Preview
Text
S_TE_1000268_Table_of_content.pdf

Download (113kB) | Preview
[img]
Preview
Text
S_TE_1000268_Chapter1.pdf

Download (201kB) | Preview
[img] Text
S_TE_1000268_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (681kB)
[img]
Preview
Text
S_TE_1000268_Chapter3.pdf

Download (928kB) | Preview
[img] Text
S_TE_1000268_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (351kB)
[img]
Preview
Text
S_TE_1000268_Chapter5.pdf

Download (190kB) | Preview
[img]
Preview
Text
S_TE_1000268_Bibliography.pdf

Download (190kB) | Preview
Official URL: http://repository.upi.edu

Abstract

Penelitian ini memaparkan hasil rancang bangun simulator pembangkit listrik tenaga mikrohidro (PLTMH). Aplikasi ini dirancang untuk mengetahui mengenai skema PLTMH, komponen – komponen PLTMH serta perhitungan potensial daya dan kapasitas daya pembangkit. Metode yang digunakan untuk rancang bangun ini adalah metode eksperimen. rancang bangun simulator pembangkit listrik tenaga mikrohidro (PLTMH) dibuat menggunakan aplikasi visual basic 6.0. kemudian simulator PLTMH diuji cobakan, Setelah PLTMH diujicobakan, didapatkan debit pada saluran 1500 l/detik, dan nilai head gross 18,6 meter, maka potensial daya sebesar 273,7 ≈ 274 kW, jika nilai debit dengan menggunakan 2 (dua) pipa pesat sebesar 1100 l/detik, tinggi jatuh air 17 meter, dengan efisiensi turbin 0,74, transmisi mekanik 0,98 dan efisiensi generator 0,85 serta jumlah kutub generator 2 kutub dan kecepatan 3000 rpm maka didapatkan 109,62 kW, jika nilai debit dengan menggunakan 1 (satu) pipa pesat sebesar 550 l/detik, tinggi jatuh air 17 meter, didapatkan 54,81 kW. Diharapkan penelitian ini, dapat mempermudah pengguna dalam memahami mengenai pembangkit listrik tenaga mikrohidro (PLTMH). Kata Kunci : Simulator, PLTMH This study presents the results of design simulator micro hydro power plant (MHPP). This application is designed to find out about the MHPP scheme, components - components of the MHPP and the potential calculation power and power generating capacity. The method used for this design is the experimental method. engineering simulator micro hydro power plant (MHPP) created using Visual Basic 6.0 application. then the simulator MHPP tested, After MHPP tested, obtained discharge on channel 1500 l / sec, and the value of the gross head of 18.6 meters, the potential power of 274 kW ≈ 273.7, if the value of the discharge by using two (2) pipe rapidly of 1100 l / sec, 17-meter high water fall, the turbine efficiency of 0.74, 0.98 and mechanical transmission efficiency of 0.85 generators and generator 2 poles pole number and speed of 3000 rpm then obtained 109.62 kW, if the value of the discharge by using 1 (one) rapidly pipe of 550 l / sec, 17-meter high water fall, obtained 54.81 kW. Hopefully this research, can help users to understand about micro hydro power plant (MHPP). Keywords: Simulator, MHPP

Item Type: Thesis (S1)
Additional Information: No. Panggil: S_TE_SET r-2014
Uncontrolled Keywords: Simulator, PLTMH
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Elektro
Depositing User: DAM staf
Date Deposited: 12 Mar 2015 01:46
Last Modified: 12 Mar 2015 01:46
URI: http://repository.upi.edu/id/eprint/13963

Actions (login required)

View Item View Item