STUDI POTENSI SUNGAI CISANGGIRI UNTUK PEMBANGKIT LISTRIK TENAGA MINI HIDRO

Salsa Kamilah Insani, - (2023) STUDI POTENSI SUNGAI CISANGGIRI UNTUK PEMBANGKIT LISTRIK TENAGA MINI HIDRO. S1 thesis, Universitas Pendidikan Indonesia.

[img] Text
S_TS_1904659_Title.pdf

Download (1MB)
[img] Text
S_TS_1904659_Chapter1.pdf

Download (113kB)
[img] Text
S_TS_1904659_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (1MB)
[img] Text
S_TS_1904659_Chapter3.pdf

Download (680kB)
[img] Text
S_TS_1904659_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (1MB)
[img] Text
S_TS_1904659_Chapter5.pdf

Download (38kB)
[img] Text
S_TS_1904659_Appendix.pdf
Restricted to Staf Perpustakaan

Download (2MB)
Official URL: https://repository.upi.edu/

Abstract

Kebutuhan akan energi listrik pada umumnya akan semakin meningkat seiring dengan berubahnya jaman, meningkatnya perekonomian, pertambahan jumlah penduduk dan kemajuan teknologi informasi. Air merupakan sumber energi penting yang tidak hanya untuk memenuhi kebutuhan air, tetapi juga bisa menjadi sumber energi pembangkit listrik. Salah satu pembangkit listrik yang dapat menggunakan energi air dalam skala kecil adalah Pembangkit Listrik Tenaga Minihidro (PLTM). Penelitian ini memiliki tujuan untuk mengetahui besarnya potensi Sungai Cisanggiri dalam menghasilkan energi listrik tahunan yang dihasilkan dari Pembangkit Listrik Tenaga Minihidro Mekarwangi. Penelitian studi potensi Sungai Cisanggiri untuk Pembangkit Listrik Tenaga Minihidro menggunakan metode penelitian deskriptif dengan pendekatan kuantitatif. Dari hasil penelitian didapatkan bahwa debit yang dapat digunakan untuk memutar turbin secara optimal adalah debit desain yang memiliki nilai 2,346 m3/detik dengan probabilitas 96,7%, dan turbin akan berhenti beroperasi ketika nilai debit sebesar 0,117302905 m3/detik. Dan dengan perhitungan kehilangan energi maka energi listrik tahunan yang dibangkitkan dari Pembangkit Listrik Tenaga Minihidro Mekarwangi sebesar 43585,592334 kWh dengan nilai kehilangan energi sebesar 0,49% dan didapatkan nilai capacity factor sebesar 99,51048% yang artinya Pembangkit Listrik Tenaga Minihidro Mekarwangi ini dapat beroperasi sebesar 99,51048% dari energi maksimal tiap tahunnya. Dengan faktor kehilangan energi terbesar berasal dari faktor gesekan pada pipa penstock. The electrical energy that is needed will keep increasing time by time to the future along with economic growth, population growth and advances in information technology. Water is an important energy source that not only fulfills water needs, but can also be an energy source for generating electricity. One of power plant that can use water energy on a small scale is called Minihydro Power Plant (PLTM). This research aims to determine the potential of the Cisanggiri River in producing annual electrical energy produced from the Mekarwangi Minihydro Power Plant. This study of the Cisangiri River potential for a Minihydro Power Plant uses descriptive research methods with a quantitative approach. From the research results, it was found that the discharge that can be used to rotate the turbine optimally is the design discharge which has a value of 2,346 m3/second with a probability of 96,7%, and the turbine will stop operating when the discharge value is 0,117302905 m3/second. And by calculating the energy loss, the annual electrical energy generated from the Mekarwangi Minihydro Power Plant is 43585,592334 kWh with an energy loss value of 0,49% and a capacity factor value of 99,51048% is obtained, which means that the Mekarwangi Minihydro Power Plant can operate at 99,51048% of maximum energy each year. The biggest energy loss factor comes from the friction factor in the penstock pipe.

Item Type: Thesis (S1)
Additional Information: https://scholar.google.com/citations?view_op=new_articles&hl=en&imq=SALSA+KAMILAH+INSANI# ID SINTA DOSEN PEMBIMBING: Rakhmat Yusuf: 6003508
Uncontrolled Keywords: Energi, Pembangkit Listrik Tenaga Minihidro, Kehilangan Energi Energy, Minihydro Power Plant, Energy Loss
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TC Hydraulic engineering. Ocean engineering
T Technology > TH Building construction
T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Sipil > Program Studi Teknik Sipil
Depositing User: SALSA KAMILAH INSANI
Date Deposited: 20 Feb 2024 05:01
Last Modified: 20 Feb 2024 05:01
URI: http://repository.upi.edu/id/eprint/115414

Actions (login required)

View Item View Item