ANALISIS KINERJA PADA PROYEK KONSTRUKSI MENGGUNAKAN METODE EARNED VALUE ANALYSIS : Studi Pada PT. Wijaya Karya Proyek Pembangunan Jalan Tol Soreang – Pasir Koja Batas Awal s.d STA 3+300

Faza, Azka Kushadiyan (2017) ANALISIS KINERJA PADA PROYEK KONSTRUKSI MENGGUNAKAN METODE EARNED VALUE ANALYSIS : Studi Pada PT. Wijaya Karya Proyek Pembangunan Jalan Tol Soreang – Pasir Koja Batas Awal s.d STA 3+300. S1 thesis, Universitas Pendidikan Indonesia.

[img] Text
S_PEA_1307058_Title.pdf

Download (264kB)
[img] Text
S_PEA_1307058_Abstract.pdf

Download (256kB)
[img] Text
S_PEA_1307058_Table_of_content.pdf

Download (228kB)
[img] Text
S_PEA_1307058_Chapter1.pdf

Download (155kB)
[img] Text
S_PEA_1307058_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (549kB)
[img] Text
S_PEA_1307058_Chapter3.pdf

Download (351kB)
[img] Text
S_PEA_1307058_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (568kB)
[img] Text
S_PEA_1307058_Chapter5.pdf

Download (75kB)
[img] Text
S_PEA_1307058_Bibliography.pdf

Download (142kB)
[img] Text
S_PEA_1307058_Appendix.pdf
Restricted to Staf Perpustakaan

Download (101kB)
Official URL: http://repository.upi.edu

Abstract

Penelitian ini bertujuan untuk mengetahui bagaimana kinerja proyek, estimasi besarnya biaya akhir dan estimasi waktu penyelesaian proyek, serta mengetahui apakah kontraktor mengalami keuntungan atau kerugian pada proyek pembangunan jalan Tol Soroja (Soreang – Pasir Koja) oleh PT Wijaya Karya. Penelitian ini menggunakan metode Earned Value Analysis sebagai alat analisis kinerja pada proyek pembangunan tol Soroja (Soreang - Pasir Koja). Metode ini memiliki tiga dimensi utama yaitu Budgeted Cost for Work Scheduled (BCWS), Budgeted Cost for Work Performance (BCWP), Actual Cost for Work Performance (ACWP). Hasil penelitian ini menunjukkan bahwa Cost performance Index (CPI) senilai 0,94 dan Schedule Performance Index (SPI) senilai 0,52 , dengan nilai ini menunjukkan bahwa proyek mengalami kelebihan biaya dan keterlambatan pada pengerjaannya. Penelitian ini juga menunjukkan hasil dari Estimate to complete (ETC) sebesar Rp. 291.528.886.195 dan Estimate at Completion sebesar Rp. 604.683.015. Pada penelitian ini juga didapati Time Estimate (TE) sebagai acuan waktu proyek selesai dengan kinerja yang ada, penyelesaian proyek adalah selama 821 hari.---- The purpose of this study is to find out the project performance, estimation of the final cost ant the estimated time of complation of the project, as well as to know whether the contractor experienced a gain or loss on the construction of road toll Soroja (Soreang – Pasir Koja) by Wijaya Karya Company. This research used earned value analysis method as a tool of construction performance analysis of road toll Soroja (Soreang - Pasir Koja). This method has three main dimensions, namely Cost for Work Scheduled (BCWS), Budgeted Cost for Work Performance (BCWP), Actual Cost for Work Performance (ACWP). The results achieved in this research showed that value of Cost Performance Index (CPI) is 0,94 and Schedule Performance Index (SPI) in the project is 0,52, that showed the project has cost overruns and delays in its work. Then in this research also showed that the outcome of the Estimate to Complate (ETC) is Rp 291.528.886.195 and Estimate at Completion (EAC) is Rp 604.683.015.671. In this research also showed the Time Estimate (TE) as a reference of the time project completion with existing performance, project completion is 821 days.

Item Type: Thesis (S1)
Additional Information: No. Panggil: S PEA FAZ a-2017 ; Pembimbing: I. Mimin Widaningsing ; NIM: 1307058
Uncontrolled Keywords: Pengendalian, Analisis Metode Nilai Hasil, Biaya, Jadwal, Controlling, Earned Value Method Analysis, Cost, Schedule.
Subjects: H Social Sciences > HB Economic Theory
H Social Sciences > HF Commerce > HF5601 Accounting
Divisions: Fakultas Pendidikan Ekonomi dan Bisnis > Pendidikan Akuntansi
Depositing User: Mr. Arif Rezkyana Nugraha
Date Deposited: 20 Dec 2018 08:02
Last Modified: 20 Dec 2018 08:02
URI: http://repository.upi.edu/id/eprint/32924

Actions (login required)

View Item View Item