SISTEM PENGGERAK PADA ALAT ROLLER BENDING TUGAS AKHIR

Pratiwi, Mia Nurul (2017) SISTEM PENGGERAK PADA ALAT ROLLER BENDING TUGAS AKHIR. D3 thesis, Universitas Pendidikan Indonesia.

[img] Text
TA_TM_1405335_Title.pdf

Download (104kB)
[img] Text
TA_TM_1405335_Appendix.pdf

Download (258kB)
[img] Text
TA_TM_1405335_Table_Of_Content.pdf

Download (204kB)
[img] Text
TA_TM_1405335_Chapter1.pdf

Download (297kB)
[img] Text
TA_TM_1405335_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (961kB)
[img] Text
TA_TM_1405335_Chapter3.pdf
Restricted to Staf Perpustakaan

Download (1MB)
[img] Text
TA_TM_1405335_Chapter4.pdf

Download (123kB)
[img] Text
TA_TM_1405335_Bibliography.pdf

Download (116kB)
[img] Text
TA_TM_1405335_Appendix.pdf
Restricted to Staf Perpustakaan

Download (258kB)
Official URL: http://repository.upi.edu

Abstract

Tugas Akhir ini membahas tentang pembuatan sistem penggerak alat roller bending. Bertujuan untuk menghasilkan komponen seperti poros 1, poros 2, engsel bubut, base bottle jack, dan steering wheel pada sistem penggerak alat roller bending, serta untuk memperoleh gambaran nyata tentang waktu dan biaya yang dibutuhkan untuk pembuatan komponen tersebut. Pembuatan komponen ini menggunakan material utama yang digunakan adalah ST60. Proses pemesinan untuk pembuatan komponen-komponen pada sistem penggerak alat roller bending meliputi: 1) proses turning; 2) proses drilling; 3) proses welding; 4) proses penekukan (bending); 5) Hand Grinding. Secara teoritis total waktu dan total biaya yang dibutuhkan adalah 14,15 jam dan Rp. 917.042,00 dan secara real total waktu dan total biaya yang dibutuhkan adalah 14,77 jam dan Rp. 948.452,00. ;--- This final project discusses the making of drive system on the roller bending tool. Aims to produce components such as Shaft 1, Shaft 2, hinges lathe, base bottle jack and steering wheel on the roller bending tool, as well as to obtain a true figure of the time and cost required for the manufacture of the component. Making this component using the main material used is ST60. The machining Process for the manufacture of components in drive system on the roller bending tool includes : 1) turning process; 2) drilling process; 3) welding process; 4) bending process; 5) hand grinding. Theoretical the total time and total cost required is 14,15 hour and Rp. 917.042,00 and in real time total and total cost required is 17,77 hour and Rp. 948.452,00.

Item Type: Thesis (D3)
Additional Information: No. Panggil: TA TM PRA s-2017; Pembimbing: I. Sabri; NIM: 1405335.
Uncontrolled Keywords: poros 1,poros 2, engsel bubut, base bottle jack, steering wheel, shaft 1, shaft 2, hinges lathe, base bottle jack, steering wheel.
Subjects: T Technology > T Technology (General)
T Technology > TJ Mechanical engineering and machinery
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Mesin > Program D3 Teknik Mesin
Depositing User: DAM staf
Date Deposited: 30 Nov 2018 06:57
Last Modified: 30 Nov 2018 06:57
URI: http://repository.upi.edu/id/eprint/32340

Actions (login required)

View Item View Item