TY - THES A1 - Alamsyah Muhammad Saputra, - A1 - Yadi Mulyadi, - Y1 - 2025/08/25/ AV - restricted UR - https://repository.upi.edu/ PB - Universitas Pendidikan Indonesia N2 - Penelitian ini menganalisis perbaikan drop tegangan pada jaringan tegangan rendah di PT. PLN (Persero) ULP Kenten Kota Palembang, khususnya pada Gardu PB 0504. Permasalahan drop tegangan disebabkan oleh peningkatan beban pada setiap tiang, terutama di ujung tiang. Hasil simulasi menggunakan software ETAP 19.0.1 dan perhitungan Microsoft Excel menunjukkan bahwa sebelum perbaikan, rata-rata drop tegangan mencapai 10,86% pada fasa S dan 9,29% pada fasa T. Nilai ini melampaui batas standar PLN (SPLN No. 1:1995 dan SPLN No. 72:1987) yang menetapkan batas maksimum penurunan tegangan 5% dan tidak melebihi 10% untuk jaringan distribusi. Puncak drop tegangan tertinggi terjadi pada tiang ujung (Tiang 7) dengan 14% pada fasa S dan 12% pada fasa T. Solusi yang diusulkan adalah penambahan transformator distribusi berkapasitas 250 kVA di titik tiang ujung (Tiang 7). Setelah penambahan transformator, simulasi menunjukkan penurunan drop tegangan yang signifikan, menjadi 4% pada fasa S dan 4% pada fasa T di tiang ujung. Secara keseluruhan, rata-rata drop tegangan pada jaringan distribusi setelah perbaikan berada di bawah 5%, sesuai dengan standar PLN. This study analyzes voltage drop improvement in the low-voltage distribution network at PT. PLN (Persero) ULP Kenten, Palembang City, specifically at Distribution Transformer PB 0504. The Voltage Drop issue is caused by increasing load on each utility pole, particularly at the end of the line. Simulation results using ETAP 19.0.1 software and calculations in Microsoft Excel show that before the improvement, the average voltage drop reached 10.86% on phase S and 9.29% on phase T. These values exceed the standard limits set by PLN (SPLN No. 1:1995 and SPLN No. 72:1987), which specify a maximum allowable voltage drop of 5% and not exceeding 10% for distribution networks. The highest voltage drop occurred at the end pole (Pole 7), reaching 14% on phase S and 12% on phase T. the proposed solution is the addition of a 250 kVA distribution transformer at the end pole (Pole 7). After the transformer was added, simulations showed a significant reduction in voltage drop to 4% on both phase S and phase T at the end pole. Overall, the average Voltage Drop across the distribution network after the improvement is below 5%, complying with PLN standards. KW - Drop Tegangan KW - Jaringan Tegangan Rendah KW - Transformator Distribusi KW - ETAP 19.0.1 Voltage Drop KW - Low Voltage Network KW - Distribution Transformer KW - ETAP 19.0.1 M1 - other ID - repoupi145489 TI - ANALISIS PERBAIKAN DROP TEGANGAN PADA JARINGAN TEGANGAN RENDAH MENGGUNAKAN TRAFO SISIPAN DI PENYULANG KACER KOTA PALEMBANG N1 - https://scholar.google.com/citations?hl=en&user=CHCNVyYAAAAJ ID SINTA Dosen Pembimbing: Yadi Mulyadi: 6003577 ER -