eprintid: 135934 rev_number: 20 eprint_status: archive userid: 216591 dir: disk0/00/13/59/34 datestamp: 2025-08-20 09:09:14 lastmod: 2025-08-20 09:09:14 status_changed: 2025-08-20 09:09:14 type: thesis metadata_visibility: show creators_name: Bintang Putra Adiarsa, - creators_name: Siti Fatimah, - creators_name: Khusnul Novianingsih, - creators_nim: NIM2103724 creators_nim: NIDN0023086806 creators_nim: NIDN0428117701 creators_id: bintangputraadiarsa@upi.edu creators_id: sitifatimah@upi.edu creators_id: k_novianingsih@upi.edu contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: Siti Fatimah, - contributors_name: Khusnul Novianingsih, - contributors_nidn: NIDN0023086806 contributors_nidn: NIDN0428117701 contributors_id: sitifatimah@upi.edu contributors_id: k_novianingsih@upi.edu title: OPTIMASI PERENCANAAN PRODUKSI MENGGUNAKAN LOGIKA FUZZY TSUKAMOTO DAN MULTI OBJECTIVE PARTICLE SWARM OPTIMIZATION ispublished: pub subjects: QA subjects: TS divisions: MAT full_text_status: restricted keywords: Perencanaan Produksi, Prediksi Permintaan, FIS Tsukamoto, MOPSO Production Planning, Demand Prediction, FIS Tsukamoto, MOPSO note: ID SINTA Dosen Pembimbing: Siti Fatimah: 5978161 Khusnul Novianingsih: 258640 abstract: Salah satu aspek krusial dalam dunia industri adalah perencanaan produksi, terutama dalam menghadapi permintaan pasar yang fluktuatif. Ketidaktepatan dalam perencanaan jumlah produksi dapat menyebabkan kerugian atau kehilangan peluang keuntungan. Untuk mengatasi permasalahan ini, penelitian ini mengusulkan integrasi metode Fuzzy Inference System (FIS) Tsukamoto dan Multi-Objective Particle Swarm Optimization (MOPSO). FIS Tsukamoto digunakan untuk meramalkan permintaan, sedangkan MOPSO digunakan untuk mengoptimalkan dua fungsi tujuan, yaitu meminimalkan total waktu produksi dan memaksimalkan kapasitas produksi. Penelitian ini menggabungkan kedua metode untuk menghasilkan keputusan perencanaan produksi yang lebih efektif dan efisien. Hasil penelitian menunjukkan bahwa model perencanaan produksi menggunakan FIS Tsukamoto dan MOPSO mampu menghasilkan solusi optimal dalam pemenuhan permintaan pasar secara tepat dan berkelanjutan. One of the crucial aspects of industries is regarding production planning, especially in the face of fluctuating market demand. Inaccuracy in planning production quantities can lead to losses or missed profit opportunities. This research proposes integrating the Tsukamoto Fuzzy Inference System (FIS) method and Multi-Objective Particle Swarm Optimization (MOPSO) to address this issue. The Tsukamoto FIS is used to forecast demand. MOPSO is used to optimize two objective functions: minimize total production time and maximize production capacity. This research combines both methods to produce more effective and efficient production planning decisions.. The research results show that the production planning model using Tsukamoto FIS and MOPSO can generate optimal solutions to meet market demand accurately and sustainably. date: 2025-07-16 date_type: published institution: Universitas Pendidikan Indonesia department: KODEPRODI44201#Matematika_S1 thesis_type: other thesis_name: other official_url: https://repository.upi.edu/ related_url_url: https://perpustakaan.upi.edu/ related_url_type: org citation: Bintang Putra Adiarsa, - and Siti Fatimah, - and Khusnul Novianingsih, - (2025) OPTIMASI PERENCANAAN PRODUKSI MENGGUNAKAN LOGIKA FUZZY TSUKAMOTO DAN MULTI OBJECTIVE PARTICLE SWARM OPTIMIZATION. S1 thesis, Universitas Pendidikan Indonesia. document_url: http://repository.upi.edu/135934/1/S_MAT_2103724_Title.pdf document_url: http://repository.upi.edu/135934/2/S_MAT_2103724_Chapter1.pdf document_url: http://repository.upi.edu/135934/3/S_MAT_2103724_Chapter2.pdf document_url: http://repository.upi.edu/135934/4/S_MAT_2103724_Chapter3.pdf document_url: http://repository.upi.edu/135934/5/S_MAT_2103724_Chapter4.pdf document_url: http://repository.upi.edu/135934/6/S_MAT_2103724_Chapter5.pdf document_url: http://repository.upi.edu/135934/7/S_MAT_2103724_Appendix.pdf