PERENCANAAN PEMASANGAN JARINGAN TEGANGAN MENENGAH UNTUK TRAFO 1000 KVA (STUDI KASUS DI GEDUNG FPTK DAN COE)

Teuku Faisal Ibrahim, - (2022) PERENCANAAN PEMASANGAN JARINGAN TEGANGAN MENENGAH UNTUK TRAFO 1000 KVA (STUDI KASUS DI GEDUNG FPTK DAN COE). S1 thesis, Universitas Pendidikan Indonesia.

Abstract

Jaringan tegangan menengah sering disebut juga jaringan distribusi primer adalah
suatu bagian dari sistem tenaga listrik antara gardu induk dan gardu distribusi.
Penyaluran tenaga listrik pada jaringan distribusi primer menggunakan 3 sistem
saluran diantaranya saluran kawat udara, saluran kabel dan sistem kabel tanah. Pada
pendistribusian tenaga listrik ke pengguna tenaga listrik di suatu kawasan,
perencanaan pemasangan jaringan tegangan menengah merupakan hal penting agar
terhindar dari rugi-rugi daya (losses), tidak efisiennya biaya yang dikeluarkan, dan
berbagai kerusakan pada jaringan tegangan menengah.. Penelitian ini bertujuan
untuk mengetahui bagaimana tahap-tahap perencanaan pemasangan jaringan
tegangan menengah berupa perencanaan denah kabel, rencana penarikan jaringan
dan struktur urugan tanahnya. Metode analisis yang dilakukan berupa perhitungan
melalui data yang telah didapat berupa denah penarikan kabel, kabel apa yang
digunakan dalam denah tersebut dan mengapa kabel tersebut digunakan, lalu
mengolahnya, kemudian bagaimana konstruksi kabel bawah tanahnya dan
komponen pada kubikel tegangan menengah, kemudian perhitungan yang
dilakukan dengan rumus untuk mencari arus beban penuh, drop tegangan, untuk
mendapatkan luas penampang dari kabel, dan menghitung kapasitas Fuse. Hasil
penelitian ini menunjukan bahwa luas penampang kabel yang digunakan pada
perencanaan pemasangan jaringan tegangan mnengah ini adalah 240 mm2
,
kemudian trafo yang digunakan adalah trafo dengan kapasitas 1000 kVA, struktur
urugan tanah yang sedikit berbeda dari Standar Konstruksi Jaringan dengan
kedalaman galian tanah yaitu hanya 75 cm, dan Fuse yang digunakan sebagai
pengaman pada kubikel dengan rating 63 A.

The medium voltage network, also known as the primary distribution network, is a
part of the electric power system between substations and distribution substations.
The distribution of electricity in the primary distribution network uses 3 channel
systems including aerial wire lines, cable lines and ground cable systems. In the
distribution of electricity to electric power users in an area, planning for the
installation of a medium voltage network is important in order to avoid power
losses (losses), inefficient costs incurred, and various damages to the medium
voltage network. This study aims to knowing how the stages of planning the
installation of a medium-voltage network are in the form of cable layout planning,
network withdrawal plans and the earthfill structure. The descriptive analysis
method is carried out in the form of a scientific explanation of the data that has
been obtained in the form of a cable drawing plan, what cable is used in the plan
and why the cable is used, then how the underground cable construction and the
network withdrawal plan, then the calculations are carried out with the formula for
find the full load current, voltage drop, to get the cross-sectional area of the cable,
and calculate the NH Fuse capacity. The results of this study indicate that the cross�sectional area of the cable used in planning the installation of this medium voltage
network is 240 mm2, then the transformer used is a transformer with a capacity of
1000 kVA, the soil backfill structure is slightly different from the Network
Construction Standard with a soil excavation depth of only 75 cm. , and Fuse which
is used as a safety on cubicle with rating 63A.

[thumbnail of S_TE_1703016_Title.pdf] Text
S_TE_1703016_Title.pdf

Download (247kB)
[thumbnail of S_TE_1703016_Chapter1.pdf] Text
S_TE_1703016_Chapter1.pdf

Download (54kB)
[thumbnail of S_TE_1703016_Chapter2.pdf] Text
S_TE_1703016_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (508kB)
[thumbnail of S_TE_1703016_Chapter3.pdf] Text
S_TE_1703016_Chapter3.pdf

Download (364kB)
[thumbnail of S_TE_1703016_Chapter4.pdf] Text
S_TE_1703016_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (312kB)
[thumbnail of S_TE_1703016_Chapter5.pdf] Text
S_TE_1703016_Chapter5.pdf

Download (49kB)
[thumbnail of S_TE_1703016_Appendix.pdf] Text
S_TE_1703016_Appendix.pdf
Restricted to Staf Perpustakaan

Download (204kB)
Official URL: http://repository.upi.edu;
Item Type: Thesis (S1)
Uncontrolled Keywords: Kata Kunci: Jaringan Tegangan Menengah (JTM), Trafo, Luas Penampang Kabel Keywords: Medium Voltage Network (JTM), Transformer, Cable Cross-sectional Area.
Subjects: L Education > L Education (General)
T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Pendidikan Teknik dan Industri > Jurusan Pendidikan Teknik Elektro > Program Studi Teknik Tenaga Elektrik
Depositing User: Teuku Faisal Ibrahim
Date Deposited: 07 Feb 2022 01:36
Last Modified: 07 Feb 2022 01:36
URI: http://repository.upi.edu/id/eprint/70839

Actions (login required)

View Item View Item