Nur Aliyah, - (2021) ANALISIS KOORDINASI RELAI OCR DAN GFR PADA TRAFO 4 GARDU INDUK SUNYARAGI CIREBON. S1 thesis, Universitas Pendidikan Indonesia.
Text
S_TE_1704817_Title.pdf Download (188kB) |
|
Text
S_TE_1704817_Chapter1.pdf Download (153kB) |
|
Text
S_TE_1704817_Chapter2.pdf Restricted to Staf Perpustakaan Download (357kB) |
|
Text
S_TE_1704817_Chapter3.pdf Download (356kB) |
|
Text
S_TE_1704817_Chapter4.pdf Restricted to Staf Perpustakaan Download (312kB) |
|
Text
S_TE_1704817_Chapter5.pdf Download (150kB) |
|
Text
S_TE_1704817_Appendix.pdf Restricted to Staf Perpustakaan Download (294kB) |
Abstract
ABSTRAK Energi listrik merupakan energi yang akan terus mengalami peningkatan penggunaan seiring bertambahnya akses listrik serta perubahan gaya hidup masyarakat Indonesia. Dengan meningkatnya penggunaan beban yang seiring dengan kenaikan jumlah penduduk, hal ini memungkinkan terjadinya peningkatan presentasi terjadinya gangguan. Permasalahan gangguan yang seringkali terjadi pada tempat penelitian ini adalah gangguan hubung singkat (short sircuit), dimana gangguan ini diakibatkan oleh faktor alam berupa sambaran petir. Pada lokasi penelitian juga terdapat permasalahan pada bagian setting relai OCR dan GFR, salah satu permasalahannya adalah setting relai pada relai tersebut belum memenuhi standar setting yang seharusnya, sehingga diperlukan koordinasi dan setting relai OCR dan GFR yang baik untuk mengatasi gangguan tersebut. Metode penelitian yang penulis lakukan pada penelitian ini penulis menggunakan metode perhitungan manual koordinasi relai OCR dan GFR dengan analisis data. Hal ini bertujuan untuk membandingkan hasil perhitungan yang penulis lakukan dengan data yang ada di lapangan. Subjek yang diteliti adalah relai OCR dan relai GFR pada transformator 4 dengan daya 60 MVA. Langkah penelitian yang dilakukan penulis adalah mengumpulkan data, pra pengolahan data, pengolahan data dan penyajian hasil penelitian. Pada hasil penelitian yang penulis lakukan diketahui bahwa terdapat nilai TMS relai GFR yang tidak memenuhi standar yang sudah ditentukan, dimana terdapat selisih yang cukup besar antara data yang ada dilapangan dengan data hasil perhitungan yang penulis lakukan. Dari perbandingan hasil perhitungan dengan data di lapangan juga diketahui bahwa data di lapangan sudah cukup baik tetapi waktu kerja (TMS) pada data lapangan cenderung lebih lambat dari hasil perhitungan Kata Kunci : Proteksi, Koordinasi, Relai, OCR, GFR ABSTRACK Electrical energy is energy that will continue to increase in use along with increasing access to electricity and changes in the lifestyle of the Indonesian people. With the increase in load usage along with the increase in population, this allows for an increase in the presentation of disturbances. The problem of disturbance that often occurs in this research area is a short circuit, where this disturbance is caused by natural factors in the form of lightning strikes. At the research location there are also problems in the OCR and GFR relay settings, one of the problems is that the relay settings on the relay do not meet the standard setting that should be, so coordination and good OCR and GFR relay settings are needed to overcome these disturbances. The research method that the author did in this study the author used the manual calculation method of the OCR and GFR relay coordination with data analysis. It aims to compare the results of the calculations that the author did with the data in the field. The subjects studied were OCR relays and GFR relays on transformer 4 with a power of 60 MVA. The research steps carried out by the author are collecting data, pre-processing data, processing data and presenting research results. In the results of the research that the author did, it was found that there was a TMS value of the GFR relay that did not meet the predetermined standards, where there was a large enough difference between the data in the field and the data calculated by the author. From the comparison of the calculation results with the data in the field, it is also known that the data in the field is quite good but the working time (TMS) on the field data tends to be slower than the calculation results. Key Word : Protection, Relay, OCR, GFR, Coordination
Item Type: | Thesis (S1) |
---|---|
Uncontrolled Keywords: | Proteksi, Koordinasi, Relai, OCR, GFR |
Subjects: | L Education > L Education (General) T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Elektro > Program Studi Teknik Tenaga Elektrik |
Depositing User: | Nur Aliyah |
Date Deposited: | 10 Sep 2021 05:17 |
Last Modified: | 10 Sep 2021 05:17 |
URI: | http://repository.upi.edu/id/eprint/66523 |