PREVENTIVE MAINTENANCE JARINGAN LISTRIK ALIRAN ATAS KERETA REL LISTRIK SEBAGAI UPAYA MENINGKATKAN KEANDALAN SUPLAI ENERGI LISTRIK

Wanda Azizah, - (2021) PREVENTIVE MAINTENANCE JARINGAN LISTRIK ALIRAN ATAS KERETA REL LISTRIK SEBAGAI UPAYA MENINGKATKAN KEANDALAN SUPLAI ENERGI LISTRIK. S1 thesis, Universitas Pendidikan Indonesia.

[img] Text
S_TE_1704473_Title.pdf

Download (406kB)
[img] Text
S_TE_1704473_Chapter1.pdf

Download (369kB)
[img] Text
S_TE_1704473_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (1MB)
[img] Text
S_TE_1704473_Chapter3.pdf

Download (606kB)
[img] Text
S_TE_1704473_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (1MB)
[img] Text
S_TE_1704473_Chapter5.pdf

Download (258kB)
[img] Text
S_TE_1704473_Appendix.pdf
Restricted to Staf Perpustakaan

Download (821kB)
Official URL: http://repository.upi.edu

Abstract

Jaringan listrik aliran atas adalah pengantar daya untuk KRL dengan tegangan 1.500VDC di sepanjang jalur elektrifikasi. Dirancang dengan beberapa kawat pada saluran udara, dimana sensitif terhadap gangguan dan kerusakan. Berdasarkan peneliti terdahulu PT. KAI (Persero) bahwa tercatat gangguan short circuit hingga puluhan kali dalam kurun waktu satu tahun, sehingga hal ini akan menyebabkan drop voltage. Penelitian ini bertujuan untuk mengetahui faktor penyebab terjadinya gangguan pada jaringan listrik aliran atas, serta mengetahui upaya preventive maintenance untuk mengatasinya. Hasil penelitian ini terdapat andongan kawat dikarenakan titik persilangan kawat trolley tidak memenuhi standar referensi, dimana nilai beda selisih negatif, serta adanya ranting pohon yang mendekati peralatan saluran udara. Maka dilakukan tindakan corrective maintenance, yaitu perbaikan hanger dengan memotong hanger sebesar 3 cm di Emplasemen Bekasi (Timur) no. Wesel W 23 A. Dan memangkas ranting pohon. Overhead catenary system is a power delivery for KRL with a voltage of 1,500VDC a long the electrification line. Designed with multiple wires on the air duct, which is sensitive to interference and damage. Based on previous researchers PT. KAI (Persero) that recorded fault short circuit up to tens of times within a years, so that this will cause a voltage drop. This study aims to determine the factors that cause fault in the overhead catenary system, as well as to find out efforts preventive maintenance to overcome them. The results of this study showed that there was a wire sling because the trolley wire crossing point did not meet the reference standard, where the value of the difference was negative, as well as the presence of tree branches that approached the air duct equipment. Then actions were carried out corrective maintenance, namely repairing the hanger by cutting the hanger by 3 cm at the Bekasi (East) Emplasement no. Wesel W 23 A. And pruning tree branches.

Item Type: Thesis (S1)
Uncontrolled Keywords: Preventive Maintenance, Overhead Catenary, Electric Rail Trains, Electrical Energy
Subjects: L Education > L Education (General)
T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Elektro > Program Studi Teknik Tenaga Elektrik
Depositing User: Wanda Azizah
Date Deposited: 09 Sep 2021 07:04
Last Modified: 09 Sep 2021 07:04
URI: http://repository.upi.edu/id/eprint/66245

Actions (login required)

View Item View Item