ANALISIS PEMBEBANAN INSTALASI LISTRIK DAN SISTEM KONTROL STARTING MOTOR INDUKSI DI PT HADTEX

Hilman Aditia Setiawan, - (2018) ANALISIS PEMBEBANAN INSTALASI LISTRIK DAN SISTEM KONTROL STARTING MOTOR INDUKSI DI PT HADTEX. S1 thesis, Universitas Pendidikan Indonesia.

[img] Text
S_TE_1401739_Title.pdf

Download (163kB)
[img] Text
S_TE_1401739_Tabel_of_Content.pdf

Download (79kB)
[img] Text
S_TE_1401739_Abstract.pdf

Download (55kB)
[img] Text
S_TE_1401739_Chapter1.pdf

Download (67kB)
[img] Text
S_TE_1401739_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (541kB)
[img] Text
S_TE_1401739_Chapter3.pdf

Download (278kB)
[img] Text
S_TE_1401739_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (496kB)
[img] Text
S_TE_1401739_Chapter5.pdf

Download (72kB)
[img] Text
S_TE_1401739_Bibliography.pdf

Download (98kB)
[img] Text
S_TE_1401739_Appendix.pdf
Restricted to Staf Perpustakaan

Download (1MB)
Official URL: http://repository.upi.edu

Abstract

Penelitian ini berisi tentang analisis pembebanan instalasi listrik oleh adanya penambahan motor induksi di industri tekstil PT Hadtex. Kebutuhan instalasi listrik serta sistem pengasutan motor perlu di desain sesuai dengan fungsi motor tersebut agar terhindar dari efek negatif dari pemasangan motor induksi yang akan dipasang seperti terjadi overload transformator, drop tegangan pada instalasi existing dan lonjakan arus pada saat starting motor. Metode yang digunakan pada penelitian ini adalah dengan melakukan survey langsung untuk mendapatkan data dan konsdisi real di lapangan. Hasil dari penelitian ini, diperoleh bahwa penambahan beban motor induksi 440 kW dapat dilakukan dengan mengambil sumber dari transformator 3000 kVA dengan persentase pembebanan transformator sebesar 51.1% pada saat setelah pemasangan beban. Pemasangan instalasi listrik beban baru dapat dikoneksikan pada sistem instalasi listrik existing tanpa perlu adanya penggantian material. Untuk mengoptimalkan faktor daya, perlu adanya penambahan kapasitor bank dengan total 840 kVAR. Dari segi pengasutan motor, sistem kontrol starting star delta dapat digunakan sebagai soft starter pada motor induksi yang direncanakan. Pada saat starting, ke-empat motor akan beroperasi pada hubung star dengan konsumsi arus sebesar 318 A. Kemudian setelah 4 detik beroperasi maka ke empat motor akan beroperasi pada hubung delta dengan konsumsi arus sebesar 955 A. ..... This study contains the analysis of the loading of electrical installation by the addition of induction motor in the textile industry of PT Hadtex. The need for electrical installation and motor starting systems need to be designed in accordance with the function of the motor to avoid the negative effects of the installation of induction motors that will be installed as there is overload of the transformer, voltage drop on the existing installation and current spikes at the start of the motor. The method used in this research is by conducting direct survey to get real data and konsdisi in the field. The result of this research, it is found that the addition of 440 kW induction motor load can be done by taking source from transformer 3000 kVA with percentage of transformer loading 51.1% at the time after load installation. Installation of new electrical installations can be connected to the existing electrical installation system without the need for material replacement. To optimize the power factor, the need for additional capacitor bank with a total of 840 kVAR. In terms of starting motor, the starting star delta control system can be used as a soft starter on the induction motor that will be used. At start, all four motors will operate on star connection with current consumption of 318 A. Then after 4 second operation the four motors will operate on the delta relation with current consumption of 955 A.

Item Type: Thesis (S1)
Additional Information: No. Panggil : S TE HIL a-2018 ; Pembimbing I. I Wayan Ratnata, II. Bambang Trisno ; NIM: 1401739
Uncontrolled Keywords: motor induksi, instalasi listrik, pembebanan listrik, perbaikan faktor daya, starting star delta, induction motor, electrical installation, electrical loading, power factor improvement, starting star delta
Subjects: T Technology > T Technology (General)
T Technology > TK Electrical engineering. Electronics Nuclear engineering
T Technology > TL Motor vehicles. Aeronautics. Astronautics
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Elektro
Depositing User: Mr Tatang Saja
Date Deposited: 13 Aug 2019 07:01
Last Modified: 13 Aug 2019 07:01
URI: http://repository.upi.edu/id/eprint/37716

Actions (login required)

View Item View Item