Rizal Daffa Noer Sidik, - (2019) ANALISIS PENGARUH DISTRIBUTED GENERATION TERHADAP KEANDALAN PENYULANG MALANGBONG COKLAT (MLBC). S1 thesis, Universitas Pendidikan Indonesia.
Text
S_TE_1504316_Title.pdf Download (242kB) |
|
Text
S_TE_1504316_Chapter1.pdf Download (70kB) |
|
Text
S_TE_1504316_Chapter2.pdf Restricted to Staf Perpustakaan Download (452kB) |
|
Text
S_TE_1504316_Chapter3.pdf Download (556kB) |
|
Text
S_TE_1504316_Chapter4.pdf Restricted to Staf Perpustakaan Download (237kB) |
|
Text
S_TE_1504316_Chapter5.pdf Download (17kB) |
|
Text
S_TE_1504316_Appendix.pdf Restricted to Staf Perpustakaan Download (2MB) |
Abstract
ABSTRAK Jaringan distribusi merupakan bagian sistem tenaga listrik yang memiliki intensitas gangguan yang lebih banyak dari bagian sistem tenaga yang lain. Hal tersebut dikarenakan dekatnya jaringan distribusi pada beban yang mengakibatkan lebih banyak faktor yang dapat menjadi penyebab terjadinya gangguan. Semakin sering terjadinya gangguan, maka indeks keandalan akan semakin buruk. Salah satu upaya untuk memperbaiki indek keandalan penyulang yaitu dengan menghubungkan Distributed Generation (DG) pada penyulang. Penelitian ini akan melihat pengaruh DG terhadap indeks keandalan penyulang Malangbong Coklat (MLBC). Metode yang digunakan dalam penelitian ini adalah membandingkan hasil simulasi reliability assessment penyulang MLBC sebelum terhubung dengan DG dan setelah penyulang MLBC terhubung dengan DG menggunakan perangkat lunak ETAP 16.0 Power System. Simulasi pada penyulang sebelum menggunakan DG mendapatkan hasil SAIFI 3.8865 gangguan per pelanggan dalam satu tahun, dan SAIDI 4.3079 jam per pelanggan dalam satu tahun. Setelah penyulang MLBC terhubung dengan DG mendapatkan hasil yang optimal saat DG terhubung pada bus 4 dan bus 5 dengan hasil SAIFI 1.1802 gangguan per pelanggan dalam satu tahun, dan SAIDI 1.1079 jam per pelanggan dalam datu tahun. Kata Kunci : Penyulang Malangbong Coklat, Ditributed Generation, SAIFI, SAIDI, ETAP 16.0 ABSTRACT Distribution network is a part of an electric power system that has more intensity of failure than other parts of the power system. This is due to the close distribution network at the load which results in more factors that can be the cause of the failure. The more frequent interference, the reliability index will get worse. One effort to improve the feeder reliability index is by connecting Distributed Generation (DG) to feeders. This study will look at the influence of DG on the reliability index of Malangbong Coklat feeders (MLBC). The method used in this study is to compare the results of MLBC feeder reliability assessment simulation before connecting with DG and after connected with DG using ETAP 16.0 Power System software. Simulations on feeders before using DG get SAIFI results of 3,8865 failures per customer in one year, and SAIDI 4.3079 hours per customer in one year. After the MLBC feeder is connected with DG get the optimal results when DG is connected to bus 4 and bus 5 with the results of SAIFI 1.1802 per customer per year, and SAIDI 1.1079 hours per customer in one year Key Words : Malangbong Coklat feeders, Distributed Generation, SAIFI, SAIDI, ETAP 16.0
Item Type: | Thesis (S1) |
---|---|
Additional Information: | No. Panggil : S TE RIZ a-2019 ; Pembimbing : I. Yadi Mulyadi, II. Bambang Trisno ; NIM : 1504316 |
Uncontrolled Keywords: | Penyulang Malangbong Coklat, Ditributed Generation, SAIFI, SAIDI, ETAP 16.0 |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Elektro > Program Studi Teknik Tenaga Elektrik |
Depositing User: | Rizal Daffa Noer Sidik |
Date Deposited: | 18 Jun 2019 03:10 |
Last Modified: | 18 Jun 2019 03:10 |
URI: | http://repository.upi.edu/id/eprint/35391 |
Actions (login required)
View Item |