PROSES PEMBUATAN KOMPONEN CLAMPING UNIT UNTUK EXPANDING AND SWAGING MACHINE

Hakim, Muhamad Rizal Rahmanul (2017) PROSES PEMBUATAN KOMPONEN CLAMPING UNIT UNTUK EXPANDING AND SWAGING MACHINE. D3 thesis, Universitas Pendidikan Indonesia.

[img] Text
TA_TM_1404491_Title.pdf

Download (180kB)
[img] Text
TA_TM_1404491_Abstract.pdf

Download (64kB)
[img] Text
TA_TM_1404491_Table_Of_Content.pdf

Download (86kB)
[img] Text
TA_TM_1404491_Chapter1.pdf

Download (267kB)
[img] Text
TA_TM_1404491_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (1MB)
[img] Text
TA_TM_1404491_Chapter3.pdf
Restricted to Staf Perpustakaan

Download (757kB)
[img] Text
TA_TM_1404491_Chapter4.pdf

Download (143kB)
[img] Text
TA_TM_1404491_Bibliography.pdf

Download (55kB)
[img] Text
TA_TM_1404491_Appendix.pdf
Restricted to Staf Perpustakaan

Download (184kB)
Official URL: http://repository.upi.edu

Abstract

Penyusunan Tugas Akhir (TA) ini bertujuan untuk mengetahui proses pembuatan salah satu komponen dari Clamping Unit yang terdapat pada Expanding and Swaging machine. Serta untuk memperoleh gambaran nyata tentang waktu dan biaya yang dibutuhkan dalam pembuatan komponen tersebut. Pembuatan komponen Clamping Unit ini menggunakan material S45C. Proses pembuatan komponen ini dilakukan melalui: 1) Proses Frais CNC; 2) proses drill CNC; 3) proses peluasan lubang; 4) proses tap manual dan 5) proses fitter atau deburing manual. Secara teoritis waktu yang dibutuhkan adalah 7 jam dengan total biaya Rp. 2.198.600,- (sudah termasuk biaya material). Adapun secara realistis waktu yang diperlukan adalah 7,58 jam dengan total biaya Rp. 2.349.400,- (termasuk biaya material).;--- Preparation of Final Project (TA) aims to determine the process of making one component of the Clamping Unit contained in the Expanding and Swaging machine. And to get a real picture of the time and cost required in making these components. Clamping component manufacture This unit uses S45C material. The process of making this component is done through: 1) CNC Frais Process; 2) CNC drill process; 3) hole expansion process; 4) manual tap process and 5) manual fitter or deburing process. Theoretically the time required is 7 hours with total cost Rp. 2.198.600, - (including material cost). The realistic time required is 7.58 hours with a total cost of Rp. 2,349,400, - (including material costs).

Item Type: Thesis (D3)
Additional Information: No. Panggil: TA TM HAK p-2017; Pembimbing: I. Yayat; NIM: 1404491.
Uncontrolled Keywords: expanding and swaging machine, clamping unit
Subjects: T Technology > T Technology (General)
T Technology > TJ Mechanical engineering and machinery
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Mesin > Program D3 Teknik Mesin
Depositing User: DAM staf
Date Deposited: 30 Nov 2018 06:58
Last Modified: 30 Nov 2018 06:58
URI: http://repository.upi.edu/id/eprint/32347

Actions (login required)

View Item View Item