PERANCANGAN JARINGAN DISTRIBUSI 20 KV DI PT INDORAMA PURWAKARTA

Hidayatullah, Rahmat (2017) PERANCANGAN JARINGAN DISTRIBUSI 20 KV DI PT INDORAMA PURWAKARTA. S1 thesis, Universitas Pendidikan Indonesia.

[img] Text
S_TE_1000777_Title.pdf

Download (164kB)
[img] Text
S_TE_1000777_Abstract.pdf

Download (135kB)
[img] Text
S_TE_1000777_Table_Of_Content.pdf

Download (222kB)
[img] Text
S_TE_1000777_Chapter1.pdf

Download (273kB)
[img] Text
S_TE_1000777_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (1MB)
[img] Text
S_TE_1000777_Chapter3.pdf

Download (516kB)
[img] Text
S_TE_1000777_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (1MB)
[img] Text
S_TE_1000777_Chapter5.pdf

Download (140kB)
[img] Text
S_TE_1000777_Bibliography.pdf

Download (290kB)
[img] Text
S_TE_1000777_Appendix1.pdf
Restricted to Staf Perpustakaan

Download (91kB)
[img] Text
S_TE_1000777_Appendix2.pdf
Restricted to Staf Perpustakaan

Download (271kB)
Official URL: http://repository.upi.edu

Abstract

Semakin banyaknya beban listrik dikawasan PT Indorama dikarenakan ada penambahan pabrik baru PT Indorama berencana melakukan pengembangan pembangkit untuk memenuhi kebutuhan listrik di kawasan industri. Oleh karena itu PT Indorama berencana menambah gardu induk unit 3. Dengan adanya rencana pembangunan gardu induk tersebut, maka diperlukan juga perencanaan jaringan distribusi 20 kV dengan luas area lintasanyaitu 2430m2 dengan jalur saluran kabel tegangan menengah sepanjang 690m dari trafo distribusi unit 3 sampai ke trafo beban pabrik baru. Pembangunan SKTM 20 kV Unit 3 ini direncanakan akan menyalurkan daya sebesar 31.5KA /sirkit. Saluran jaringan tegangan menengah ini diharapkan dapat mensupply energi listrik dari Captive Power Plant (CPP) Indorama ke pabrik baru indorama yang akan digunakan untuk pengembangan industry dan meningkatkan kehandalan dan efisiensi beban biaya jangka panjang pada PT Indorama Purwakarta. ;--- The more electricity load in PT Indorama area due to the addition of new factory PT Indorama plans to develop the plant to meet the electricity needs in the industrial area. Therefore PT Indorama plans to add substation Unit 3. With the development plan of the substation, it is also necessary to plan the 20 kVdistribution networks with a trajectory area of 2430m2 with a 690m mains line cable line from distribution transformer of unit 3 to the new factory load transformer. Construction of medium voltage cable channels 20 kV Unit 3 was planned to deliver power as big as 31.5KA /circuit. Medium voltage cable channels expected to supply electrical energy from Captive Power Plant (CPP) Indorama to new Indorama factory which will be used for industrial development and improve reliability and long-term cost efficiency costs of PT Indorama Purwakarta.

Item Type: Thesis (S1)
Additional Information: No. Panggil: S TE HID p-2017; Pembimbing: I. Hasbullah, II. Wasimudin Surya S; NIM: 1000777.
Uncontrolled Keywords: sktm 20kv, cpp indorama unit3, pltu, energi listrik, 20 kv medium voltage cable channels,cpp indorama unit3,electric steam power plant, electrical energy
Subjects: T Technology > T Technology (General)
T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Elektro
Depositing User: DAM staf
Date Deposited: 30 Nov 2018 02:42
Last Modified: 30 Nov 2018 02:42
URI: http://repository.upi.edu/id/eprint/32224

Actions (login required)

View Item View Item