Pramudita, Rifqi Jalu (2017) ANALISIS PENERAPAN MRP PADA PERUSAHAAN : Studi pada Proyek X di PT. XYZ. S1 thesis, Universitas Pendidikan Indonesia.
|
Text
S_PEM_1306154_Title.pdf Download (154kB) | Preview |
|
|
Text
S_PEM_1306154_Abstract.pdf Download (259kB) | Preview |
|
|
Text
S_PEM_1306154_Table_of_content.pdf Download (220kB) | Preview |
|
|
Text
S_PEM_1306154_Chapter1.pdf Download (334kB) | Preview |
|
Text
S_PEM_1306154_Chapter2.pdf Restricted to Staf Perpustakaan Download (614kB) |
||
|
Text
S_PEM_1306154_Chapter3.pdf Download (403kB) | Preview |
|
Text
S_PEM_1306154_Chapter4.pdf Restricted to Staf Perpustakaan Download (710kB) |
||
|
Text
S_PEM_1306154_Chapter5.pdf Download (131kB) | Preview |
|
|
Text
S_PEM_1306154_Bibliography.pdf Download (131kB) | Preview |
|
Text
S_PEM_1306154_Appendix.pdf Restricted to Staf Perpustakaan Download (1MB) |
Abstract
Material adalah komponen yang sangat penting dalam proyek pelapisan pipa baja. Persediaan material berperan penting dalam kelancaran proyek selama berjalan. Pada penelitian ini, sistem Material Requirement Planning dengan teknik Lot for Lot (LFL), Economic Order Quantity (EOQ), dan Periodic Order Quatity (POQ) digunakan untuk menentukan kapan dan berapa jumlah barang yang harus dipesan untuk proyek X dengan mempertimbangkan biaya yang akan muncul nantinya. Analisis material requirement planning dengan teknik lot sizing menghasilkan teknik lot sizing yang membentuk total biaya penyimpanan terendah adalah periodic order quantity. Teknik LFL, EOQ, dan POQ membentuk biaya persediaan yang sama untuk material pipa dan air. Total biaya persediaan minimum yang terbentuk dengan teknik periodic order quantity adalah $2.593.599,45. ;---Materials have the highest urgency on pipeline coating project. Material inventory has important role to assure project’s goals are achieved. MRP system with lot sizing techniques such as: lot for lot, economic order quantity, periodic order quantity; are implemented to decide when and how many materials are needed on X project based on the cost that company will pay. MRP analysis with periodic order quantity technique result the minimum cost of all materials. Bare pipe and water has same result from every implemented lot sizing techniques. As the result, the total inventory cost is $2.593.599,45
Item Type: | Thesis (S1) |
---|---|
Additional Information: | No. Panggil : S PEM PRA a-2017; Pembimbing : I. Chairul Furqon, II. Moch. Adisultan; NIM : 1306154. |
Uncontrolled Keywords: | Proyek, MRP, Lot for lot, EOQ, POQ, project, MRP, lot for lot, EOQ, POQ. |
Subjects: | H Social Sciences > HD Industries. Land use. Labor H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management |
Divisions: | Fakultas Pendidikan Ekonomi dan Bisnis > Manajemen (non kependidikan) |
Depositing User: | Isma Anggini Saktiani |
Date Deposited: | 15 Mar 2018 03:53 |
Last Modified: | 15 Mar 2018 03:53 |
URI: | http://repository.upi.edu/id/eprint/29858 |
Actions (login required)
View Item |