ANALISIS AIR BALIK (BACKWATER) DI MUARA SUNGAI CIKAPUNDUNG AKIBAT TINGGI MUKA AIR SUNGAI CITARUM

Fauziyyah, Ulfah (2016) ANALISIS AIR BALIK (BACKWATER) DI MUARA SUNGAI CIKAPUNDUNG AKIBAT TINGGI MUKA AIR SUNGAI CITARUM. S1 thesis, Universitas Pendidikan Indonesia.

[img]
Preview
Text
S_TB_1200223_Title.pdf

Download (85kB) | Preview
[img]
Preview
Text
S_TB_1200223_Abstract.pdf

Download (347kB) | Preview
[img]
Preview
Text
S_TB_1200223_Table_of_content.pdf

Download (405kB) | Preview
[img]
Preview
Text
S_TB_1200223_Chapter1.pdf

Download (221kB) | Preview
[img] Text
S_TB_1200223_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (978kB)
[img]
Preview
Text
S_TB_1200223_Chapter3.pdf

Download (659kB) | Preview
[img] Text
S_TB_1200223_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (1MB)
[img]
Preview
Text
S_TB_1200223_Chapter5.pdf

Download (210kB) | Preview
[img]
Preview
Text
S_TB_1200223_Bibliography.pdf

Download (261kB) | Preview
[img] Text
S_TB_1200223_Appendix.pdf
Restricted to Staf Perpustakaan

Download (1MB)
Official URL: http://repository.upi.edu

Abstract

Sungai Cikapundung merupakan anak sungai dari Sungai Citarum mempunyai panjang total ± 28 km melewati Kab. Bandung Barat pada bagian hulu, Kota Bandung pada bagian tengah, dan Kab. Bandung pada bagian hilir yang bermuara di Sungai Citarum. Pada daerah muara selalu terjadi banjir apalagi setiap musim penghujan tiba. Peningkatan debit terjadi saat musim penghujan tiba. Semakin besar debit aliran maka semakin tinggi pula muka air aliran. Pertemuan debit Sungai Cikapundung dan Sungai Citarum yang besar menyebabkan adanya perbedaan tinggi muka air kedua sungai tersebut. Berdasarkan pada kondisi tersebut diketahui bahwa telah terjadi perbedaan tinggi muka air dimana tinggi muka air Sungai Citarum lebih tinggi dari Sungai Cikapundung yang berpotensi mengakibatkan arus balik (backwater). Oleh karena itu perlu diketahui panjang, luas genangan dan dalamnya arus balik (backwater) yang terjadi pada pertemuan antara kedua sungai tersebut. Penelitian dilakukan dengan menganalisis profil aliran sungai Cikapundung dan Citarum menggunakan program Hydrologic Engineering Center-River Analysis System (HEC-RAS). Data yang digunakan pada sungai Cikapundung adalah data hujan dari tiga stasiun hujan, yaitu Margahayu I, Meteo, dan Dago Pakar yang dikalibrasi dengan data AWLR sungai Cikapundung-Pasirluyu. Data debit yang digunakan pada sungai Citarum adalah data AWLR sungai Citarum-Dayeuhkolot. Pada perhitungan terdeteksi adanya arus balik air akibat tinggi muka air sungai Citarum. Dari hasil perhitungan didapatkan panjang backwater 2,8805 km, luas genangan backwater 98.559,53 m2 dan kedalaman backwater yang paling dalam mencapai 0,65 m. ;---Cikapundung river is a sub river of Citarum river has total length ± 28 km through West Bandung Regency in upper course, Bandung City in the middle, and Bandung Regency in lower course that estuary in Citarum River. In rainy seasons, the flood always occur in estuary area. Disharge increase in rainy seasons. The water surface level increase as the discharge flow rises. The large discharge junction of Cikapundung and Citarum river caused the differences of water surface level in the both. Based on that condition there has been a difference water surface level where the water surface level of Citarum river is higher than Cikapundung river that potentially cause backwater. Therefore must be known the length, the puddled area of backwater and the height of backwater that occured in the junction of both river. The research is using the analysis of Cikapundung and Citarum river’s flow profile by using Hydrologic Engineering Center-River Analysis System (HEC-RAS) software. The data used on Cikapundung river is rainfall data from three rainfall station, there are Margahayu I, Meteo, dan Dago Pakar which calibrated with AWLR data of Cikapundung-Pasirluyu river. The discharge data used on Citarum river is Citarum-Dayeuhkolot AWLR data. The calculation detects that backwater is occured due to water surface level of Citarum river. From the calculation results show that the length of backwater is 2,8805 km, the puddled area of backwater 98.559,53 m2 and the deepest backwater is 0,65 m.

Item Type: Thesis (S1)
Additional Information: No. Panggil : S TB FAU a-2016; Pembimbing : I. Sukadi, II. Mardiani.
Uncontrolled Keywords: Banjir, Backwater, HEC-RAS, Flood.
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Sipil > Program Studi Teknik Sipil
Depositing User: Mr mhsinf 2017
Date Deposited: 30 Aug 2017 09:15
Last Modified: 30 Aug 2017 09:15
URI: http://repository.upi.edu/id/eprint/25337

Actions (login required)

View Item View Item