KOORDINASI PEMBANGKIT HYDRO-THERMAL JANGKA PENDEK MENGGUNAKAN SIMULATED ANNEALING

Wicaksono, Bagus (2015) KOORDINASI PEMBANGKIT HYDRO-THERMAL JANGKA PENDEK MENGGUNAKAN SIMULATED ANNEALING. S1 thesis, Universitas Pendidikan Indonesia.

[img]
Preview
Text
S_TE_1100008_Title.pdf

Download (226kB) | Preview
[img]
Preview
Text
S_TE_1100008_Abstract.pdf

Download (43kB) | Preview
[img]
Preview
Text
S_TE_1100008_Table_of_content.pdf

Download (198kB) | Preview
[img]
Preview
Text
S_TE_1100008_Chapter 1.pdf

Download (51kB) | Preview
[img] Text
S_TE_1100008_Chapter 2.pdf
Restricted to Staf Perpustakaan

Download (273kB)
[img]
Preview
Text
S_TE_1100008_Chapter 3.pdf

Download (277kB) | Preview
[img] Text
S_TE_1100008_Chapter 4.pdf
Restricted to Staf Perpustakaan

Download (419kB)
[img]
Preview
Text
S_TE_1100008_Chapter 5.pdf

Download (43kB) | Preview
[img]
Preview
Text
S_TE_1100008_Bibliography.pdf

Download (183kB) | Preview
[img] Text
S_TE_1100008_Appendix.pdf
Restricted to Staf Perpustakaan

Download (254kB)
Official URL: http://repository.perpustakaan.upi

Abstract

Koordinasi pembangkit hidrotermal bertujuan untuk meminimalkan biaya total sistem operasi yang diwakili oleh biaya bahan bakar dan kendala selama optimisasi. Untuk melakukan optimisasi terdapat beberapa metode yang dapat digunakan. Simulated Annealing (SA) merupakan salah satu metode yang dapat digunakan untuk menyelesaikan permasalahan optimisasi. Metode ini terinspirasi dari proses annealing atau pendinginan dalam pembuatan material yang terdiri dari butir kristal. Pada koordinasi pembangkit hidrotermal prinsip dasarnya yaitu pembangkit hidro dijadikan sebagai penopang beban dasar sedangkan pembangkit termal dijadikan sebagai penopang beban sisa. Penelitian ini menggunakan 2 unit pembangkit hidro dan 6 unit pembangkit termal 25 bus dengan memperhitungkan rugi-rugi transmisi dan mempertimbangkan batasan daya pada masing-masing unit pembangkit yang dibantu oleh software MATLAB dalam penyelesaiannya. Koordinasi pembangkit hidrotermal menggunakan simulated annealing menghasilkan biaya total pembangkitan selama 24 jam sebesar $ 13288508.01. Kata kunci: Simulated Annealing (SA), Koordinasi Hidrotermal, Rugi-rugi Transmisi.   Hydrothermal power plant coordination aims to minimize the total cost of operating system that is represented by fuel cost and constraints during optimization. To perform the optimization, there are several methods that can be used. Simulated Annealing (SA) is a method that can be used to solve the optimization problems. This method was inspired by annealing or cooling process in the manufacture of materials composed of crystals. The basic principle of hydrothermal power plant coordination includes the use of hydro power plants to support basic load while thermal power plants were used to support the remaining load. This study used two hydro power plant units and six thermal power plant units with 25 buses by calculating transmission losses and considering power limits in each power plant unit aided by MATLAB software during the process. Hydrothermal power plant coordination using simulated annealing plants showed that a total cost of generation for 24 hours is $ 13,288,508.01. Keywords: Simulated Annealing (SA), Hydrothermal Coordination, Transmission Loss.

Item Type: Thesis (S1)
Additional Information: No. Panggil : S TE WIC k-2015; Pembimbing : I. Ade Gafal Abdullah, II. Wasimudin Surya
Uncontrolled Keywords: Simulated Annealing (SA), Koordinasi Hidrotermal, Rugi-rugi Transmisi
Subjects: L Education > L Education (General)
T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Elektro > Program Studi Pendidikan Teknik Elektro
Depositing User: Mrs. Neni Sumarni
Date Deposited: 22 Mar 2016 03:06
Last Modified: 22 Mar 2016 03:06
URI: http://repository.upi.edu/id/eprint/19768

Actions (login required)

View Item View Item