EVALUASI SISTEM PROTEKSI PETIR PADA SALURAN UDARA TEGANGAN TINGGI (SUTT) 150 KV

Wulandari, Kinanti (2015) EVALUASI SISTEM PROTEKSI PETIR PADA SALURAN UDARA TEGANGAN TINGGI (SUTT) 150 KV. S1 thesis, Universitas Pendidikan Indonesia.

[img]
Preview
Text
S_TE_1003074_Title.pdf

Download (411kB) | Preview
[img]
Preview
Text
S_TE_1003074_Abstract.pdf

Download (135kB) | Preview
[img]
Preview
Text
S_TE_1003074_Table_of_content.pdf

Download (226kB) | Preview
[img]
Preview
Text
S_TE_1003074_Chapter1.pdf

Download (219kB) | Preview
[img] Text
S_TE_1003074_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (700kB)
[img]
Preview
Text
S_TE_1003074_Chapter3.pdf

Download (587kB) | Preview
[img] Text
S_TE_1003074_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (902kB)
[img]
Preview
Text
S_TE_1003074_Chapter5.pdf

Download (134kB) | Preview
[img]
Preview
Text
S_TE_1003074_Bibliography.pdf

Download (202kB) | Preview
[img] Text
S_TE_1003074_Appendix.pdf
Restricted to Staf Perpustakaan

Download (375kB)
Official URL: http://repository.upi.edu

Abstract

Sistem Tenaga Listrik (STL) tidak terlepas dari gangguan, baik gangguan internal maupun gangguan eksternal, salah satu gangguan eksternal yang paling sering terjadi adalah petir. Geografis Indonesia yang dilalui garis khatulistiwa, menjadikan Indonesia beriklim tropis, hal ini mengakibatkan Indonesia memiliki hari guruh rata-rata per tahun yang sangat tinggi. Berdasarkan data dari BMKG Bandung, pada tahun 2013-2014 terdapat peningkatan jumlah hari guruh yang cukup tinggi, yaitu 199 hari guruh pada tahun 2013 dan 477 hari guruh pada tahun 2014. Kenaikan hari guruh tersebut berdampak pada kerapatan jumlah sambaran petir. Sambaran petir pada saluran transmisi tegangan tinggi dapat menyebabkan terganggunya penyaluran tenaga listrik yang berakibat terjadinya lompatan api pada isolator di menara transmisi. Terganggunya isolator dapat disebabkan oleh kegagalan perisaian (Shielding Failure) dan backflashover (tegangan api balik) pada menara transmisi. Kegagalan suatu sistem perisaian dapat diketahui dengan menggunakan metode elektrogeometris sedangkan back flashover menggunakan metode gelombang berjalan. Pada penelitian ini dilakukan evaluasi pada menara tipe AA SUTT 150 kV Rancaekek-Cikasungka, hasilnya diperoleh nilai gangguan perisaian 0,07 gangguan/100km/tahun, dan jumlah sambaran kilat/km/tahun yaitu 425 sambaran/100 km/tahun. Dari hasil evaluasi diperoleh bahwa menara SUTT 150 kV yang terpasang saat ini sudah terproteksi secara baik dan termasuk dalam kategori baik. The Electric Power System can not be separated from disturbances, both internal and external. One of The most often external disturbance is lightning. Indonesia which geographically passed by the equator has a tropical climate that causing Indonesia has a high thunderstorm days per year. Based on the data from BMKG Bandung, in 2013-2014 there is an increasing number of thunderstorm days, 199 thunderstorm days in 2013 and 477 thunderstorm days in 2014. The increasing days of thunderstorm make an impact on the density number of lightning strikes. Lightning strikes on high-voltage transmission line can cause disturbances of electrical power which impact the sparks on the insulator in the transmission tower. Disturbances of the insulator can be caused by a Shielding Failure and back flashover on transmission towers. The failure of a shielding system can be determined by using the electrogeometric method and back flashover using traveling wave method. This study evaluate the AA tower SUTT 150 kV Rancaekek-Cikasungka, the results obtained value of 0.07 shielding failure disruption / 100 km / year, and the number of lightning / km / year is 425 strokes / 100 km / year. The evaluation results showed that the SUTT 150 kV tower is now well protected.

Item Type: Thesis (S1)
Additional Information: No. Panggil : S TE WUL e-2015; Pembimbing : I. Jaja Kustija, II. Hasbullah.
Uncontrolled Keywords: Evaluasi, petir, groundwire, shielding falilure, back flashover
Subjects: L Education > L Education (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Elektro
Depositing User: Staf Koordinator 3
Date Deposited: 16 Sep 2015 02:32
Last Modified: 16 Sep 2015 02:32
URI: http://repository.upi.edu/id/eprint/16754

Actions (login required)

View Item View Item