ANALISIS GANGGUAN HUBUNG SINGKAT PADA SISTEM TENAGA LISTRIK DI PT. PERTAMINA REFINERY UNIT (RU) VI BALONGAN MENGGUNAKAN SOFTWARE ETAP 7.5.0

Destiani, Puspa Lita (2014) ANALISIS GANGGUAN HUBUNG SINGKAT PADA SISTEM TENAGA LISTRIK DI PT. PERTAMINA REFINERY UNIT (RU) VI BALONGAN MENGGUNAKAN SOFTWARE ETAP 7.5.0. S1 thesis, Universitas Pendidikan Indonesia.

[img]
Preview
Text
S_TE_1005183_Title.pdf

Download (163kB) | Preview
[img]
Preview
Text
S_TE_1005183_Abstract.pdf

Download (136kB) | Preview
[img]
Preview
Text
S_TE_1005183_Table_Of_Contents.pdf

Download (129kB) | Preview
[img]
Preview
Text
S_TE_1005183_Chapter_1.pdf

Download (162kB) | Preview
[img] Text
S_TE_1005183_Chapter_2.pdf
Restricted to Staf Perpustakaan

Download (735kB)
[img]
Preview
Text
S_TE_1005183_Chapter_3.pdf

Download (535kB) | Preview
[img] Text
S_TE_1005183_Chapter_4.pdf
Restricted to Staf Perpustakaan

Download (1MB)
[img]
Preview
Text
S_TE_1005183_Chapter_5.pdf

Download (121kB) | Preview
[img]
Preview
Text
S_TE_1005183_Bibliography.pdf

Download (110kB) | Preview
Official URL: http://repository.upi.edu

Abstract

Penelitian ini dilakukan untuk mengetahui kemungkinan-kemungkinan yang terjadi pada gangguan arus hubung singkat di busbar 20 kV, 3,15 kV, dan 0,42 kV. Mengetahui nilai-nilai gangguan arus hubung singkat di busbar 20 kV, 3,15 kV dan 0,42 kV dengan menggunakan simulasi program software ETAP 7.5.0 dan menggunakan perhitungan manual. Mengetahui jenis gangguan arus hubung singkat manakah yang memiliki gangguan terbesar dan terkecil. Dan perhitungan manakah yang memiliki kinerja lebih cepat dan tepat. Setelah dilakukan analisis gangguan arus hubung singkat, kemungkinan yang terjadi setelah diberikan gangguan pada busbar ternyata beberapa CB/ pemutus tenaga tiba-tiba putus/ trip, karena CB merupakan peralatan yang dapat digunakan untuk memutuskan atau menghubungkan arus listrik sesuai dengan kapasitas ratingnya. Semakin jauh jarak saluran dari pusat pembangkit maka semakin besar pula hasil gangguan arus hubung singkat tersebut. Salah satu contohnya yaitu pada gangguan arus hubung singkat 3 fasa pada gangguan di busbar 20 kV yaitu sebesar 17,751 kA, di busbar 3,15 kV yaitu sebesar 22,213 kA dan di busbar 0,42 kV yaitu sebesar 40,478 kA. Jenis gangguan arus hubung singkat terbesar terdapat pada jenis gangguan arus hubung singkat 3 fasa. Dan jenis gangguan arus hubung singkat terkecil terdapat pada jenis gangguan arus hubung singkat fasa ke tanah. Dengan demikian dapat disimpulkan bahwa perhitungan program software ETAP 7.5.0 memiliki tingkat ketelitian lebih tinggi, lebih cepat dan tepat dibandingkan dengan menggunakan perhitungan manual. This study was conducted to determine the possibilities that occur in the short-circuit current interruption in 20 kV busbar, 3,15 kV, and 0,42 kV. Knowing values of short circuit current interruption in busbar 20kV 3,15kV and 0,42 kV by using simulation program ETAP 7.5.0 and manual calculation. Knowing types of short circuit current interruption which has the largest and smallest disturbance. which calculation and has a faster and more precise performance. After analyzing the short circuit current interruption, the possibility of which occurred after given disturbance on busbar apparently some circuit breaker suddenly dropped, since CB is an equipment that can be used to connect or disconnected the electric current in accordance with the rating capacity. The farther of distance from the center line, the greater of power interruption results of short-circuit. One example is the current noise 3-phase short circuit on the interference at 20KV busbar amount 17,751 kA, in busbar 3,15 kV amount 22,213 kA and in busbar 0,42 kV amount 40,478 kA. Type of short circuit current present in most types of interference 3-phase short-circuit. And types of disorders are the smallest short-circuit on the type of disorder phase short circuit to ground. It can be concluded that the calculation of software program ETAP 7.5.0 have a higher level of accuracy, faster and more accurate than using a manual calculation.

Item Type: Thesis (S1)
Additional Information: No. Panggil: STE DES a-2014; Pembimbing: I. Tasma Sucita, II. Chris Timotius
Uncontrolled Keywords: Analisis gangguan, arus hubung singkat, ETAP 7.5.0
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Pendidikan Teknologi dan Kejuruan > Jurusan Pendidikan Teknik Elektro > Program Studi Pendidikan Teknik Elektro
Depositing User: Staf Koordinator 3
Date Deposited: 19 Aug 2015 07:15
Last Modified: 19 Aug 2015 07:15
URI: http://repository.upi.edu/id/eprint/16419

Actions (login required)

View Item View Item