Monalisa Aulia Mukti, - (2024) ANALISIS KINERJA WAKTU PROYEK PEMBANGUNAN ITB INNOVATION PARK MENGGUNAKAN METODE PERFORMANCE INTENSITY. S1 thesis, Universitas Pendidikan Indonesia.
This is the latest version of this item.
Text
S_TS_2001161_Title.pdf Download (428kB) |
|
Text
S_TS_2001161_Chapter1.pdf Download (120kB) |
|
Text
S_TS_2001161_Chapter2.pdf Restricted to Staf Perpustakaan Download (545kB) |
|
Text
S_TS_2001161_Chapter3.pdf Download (142kB) |
|
Text
S_TS_2001161_Chapter4.pdf Restricted to Staf Perpustakaan Download (628kB) |
|
Text
S_TS_2001161_Chapter5.pdf Download (43kB) |
|
Text
S_TS_2001161_Appendix.pdf Restricted to Staf Perpustakaan Download (3MB) |
Abstract
Dalam pelaksanaan proyek, pemilik proyek maupun kontraktor sangat memperhatikan ketepatan waktu untuk menyelesaikan proyek. Ketepatan waktu dalam proyek konstruksi merupakan hal yang sangat penting karena dapat memengaruhi banyak hal. Tidak jarang proyek mengalami keterlambatan, sehingga diperlukan metode pengendalian khusus untuk mengurangi kemungkinan masalah yang semakin besar. Dikarenakan adanya ketidaksesuaian antara progres waktu yang direncanakan dan waktu yang terjadi di lapangan, maka perlu dilakukan analisis kinerja waktu. Dari analisis tersebut, dapat diketahui perkiraan waktu yang dibutuhkan untuk menyelesaikan Proyek Pembangunan ITB Innovation Park serta mendapatkan perbandingan antara hasil analisis dengan durasi aktual proyek. Penelitian ini menggunakan metode deskriptif kuantitatif dengan menganalisis variabel-variabel berdasarkan data yang diperoleh dari hasil observasi. Proyek Pembangunan ITB Innovation Park direncanakan akan selesai pada 7 Juli 2024 dengan durasi 706 hari. Analisis kinerja waktu ini akan dilaksanakan pada 2 periode, yaitu periode ke-32 (minggu ke-64) dan periode ke-45 (minggu ke-90). Dari hasil analisis periode-periode tersebut, selesainya tanggal proyek pada periode ke-32 (minggu ke-64) diprediksi akan selesai tepat pada 706 hari dan kinerja waktu proyek mencapai ketepatan jadwal sesuai dengan yang direncanakan berdasarkan posisi saat pelaporan periode ke-32 (minggu ke-64). Kemudian berdasarkan periode ke-45 (minggu ke-90) proyek diprediksi akan berakhir lebih dari 706 hari dan dipastikan akan mengalami keterlambatan jadwal dari rencana berdasarkan posisi saat pelaporan tersebut. Dari prediksi durasi keterlambatan yang diperoleh, maka didapatkan klaim keseluruhan sebesar 0,76% dari nilai kontrak. In the implementation of the project, both project owners and contractors pay close attention to the accuracy of the timing to complete the project. The timing of a construction project is very important because it can affect a lot of things. It's not uncommon for projects to be delayed, so special control methods are needed to reduce the likelihood of growing problems. Due to the inconsistency between the planned time progress and the time that occurs in the field, it is necessary to carry out a time performance analysis. From this analysis, it can be estimated the time required to complete the ITB Innovation Park Development Project as well as obtain a comparison between the results of the analysis and the actual duration of the project. This study uses quantitative descriptive methods by analyzing variables based on data obtained from observations. The ITB Innovation Park Development Project is scheduled to be completed on July 7, 2024, for a duration of 706 days. The performance analysis will be carried out in two periods, namely the 32nd period (64 weeks) and the 45th period (90 weeks). From the results of the analysis of these periods, the completion date of the project in the 32nd period (64 weeks) is predicted to be completed exactly at 706 days, and the project performance time reaches the timely accuracy as planned on the basis of the position at the reporting period 32nd (65 weeks). Then, based on the 45th period (90 weeks), the project is forecast to end by more than 704 days and is assured to have a delay in the schedule of the plan based on its position at reporting time. From the prediction of the length of the delay obtained, the total claim is 0,76% of the contract value.
Item Type: | Thesis (S1) |
---|---|
Additional Information: | https://scholar.google.com/citations?hl=en ID SINTA Dosen Pembimbing: Siti Nurasiyah: 6003859 |
Uncontrolled Keywords: | Performance Intensity, Kinerja Proyek, Waktu Performance Intensity, Project Performance, Time |
Subjects: | L Education > L Education (General) T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Pendidikan Teknik dan Industri > Jurusan Pendidikan Teknik Sipil > Program Studi Teknik Sipil |
Depositing User: | Monalisa Aulia Mukti |
Date Deposited: | 11 Nov 2024 02:43 |
Last Modified: | 11 Nov 2024 02:43 |
URI: | http://repository.upi.edu/id/eprint/128184 |
Available Versions of this Item
-
ANALISIS KINERJA WAKTU PROYEK PEMBANGUNAN ITB INNOVATION PARK MENGGUNAKAN METODE PERFORMANCE INTENSITY. (deposited UNSPECIFIED)
- ANALISIS KINERJA WAKTU PROYEK PEMBANGUNAN ITB INNOVATION PARK MENGGUNAKAN METODE PERFORMANCE INTENSITY. (deposited 11 Nov 2024 02:43) [Currently Displayed]
Actions (login required)
View Item |