STUDI OPTIMASI POLA OPERASI WADUK CITARA UNTUK MEMENUHI KEBUTUHAN ENERGI PEMBANGKIT LISTRIK TENAGA AIR

Putri Luthfi Alifidia, - (2024) STUDI OPTIMASI POLA OPERASI WADUK CITARA UNTUK MEMENUHI KEBUTUHAN ENERGI PEMBANGKIT LISTRIK TENAGA AIR. S1 thesis, Universitas Pendidikan Indonesia.

[img] Text
S_TS_1808343_Title.pdf

Download (1MB)
[img] Text
S_TS_1808343_Chapter1.pdf

Download (90kB)
[img] Text
S_TS_1808343_Chapter2.pdf
Restricted to Staf Perpustakaan

Download (858kB)
[img] Text
S_TS_1808343_Chapter3.pdf

Download (462kB)
[img] Text
S_TS_1808343_Chapter4.pdf
Restricted to Staf Perpustakaan

Download (2MB)
[img] Text
S_TS_1808343_Chapter5.pdf

Download (78kB)
[img] Text
S_TS_1808343_Appendix.pdf
Restricted to Staf Perpustakaan

Download (41MB)
Official URL: https://repository.upi.edu/

Abstract

Waduk Cirata merupakan salah satu waduk terbesar di Asia Tenggara yang terletak di Purwakarta Provinsi Jawa Barat. Tujuan utama pembangunan Waduk Cirata adalah untuk Pembangkit Listrik Tenaga Air (PLTA). Dengan peningkatan jumlah kebutuhan akan energi listrik serta adanya kecenderungan penurunan fungsi pelayanan waduk akibat sedimentasi diperlukan rencana operasi yang optimum. Dalam Perencanaan operasi Waduk Cirata menggunakan model program linier dengan aplikasi software Program Linier POM-QM for Windows Version 4 (Production and Operation Management – Quantitative Methods for Windows) dengan memaksimalkan produksi energi listrik. Data yang digunakan adalah data debit inflow bulanan yang masuk ke Waduk Cirata selama 23 tahun yaitu tahun 2000-2022. Untuk kebutuhan optimasi diperlukan data yang panjang sehingga dilakukan perhitungan debit bangkitan metode Thomas-fiering, data digenerate sampai tahun 2045, selain itu dibutuhkan data evaporasi, data teknis waduk, dan data instalasi PLTA. Pada optimasi ini turbin yang dioperasikan diasumsikan menjadi 2 turbin utuk tahun kering dan 3 turbin untuk tahun basah dan tahun normal, pengoperasian dikelompokan menjadi 3 kondisi yaitu kondisi musim basah Q20% dengan keandalan 20%, kondisi normal Q50% dengan keandalan 50%, dan kondisi musim kering Q80% dengan keandalan 80%. Hasil dari perencanaan optimalisasi operasi PLTA adalah 1,119,061.6 MWh pertahun pada tahun kering (80%) berkurang 18.82 % dibanding daya listrik eksisting, untuk tahun normal hasil produksi listrik adalah 1,539,500.8 MWh pertahun naik 11.6 %, dan untuk tahun basah hasil produksi listrik adalah 2,027,108.7 MWh naik 47.05%. Sedangkan hasil produksi listrik eksisting PLTA Cirata adalah 1,378,434.21 MWh. Selain itu terdapat penurunan volume efektif waduk Cirata, pada tahun 2007 volume efektif waduk adalah 837.51 juta m3, sedangkan pada tahun 2022 volume efektif waduk sebesar 782.6 juta m3. Cirata Reservoir is one of the largest reservoirs in Southeast Asia, located in Purwakarta, West Java Province. The main purpose of Cirata Reservoir construction is for Hydroelectric Power Plant. With the increase in the number of needs for electrical energy and the tendency to decrease the service function of the reservoir due to sedimentation, an optimum operation plan is needed. In planning the operation of Cirata Reservoir using a linear program model with the POM-QM for Windows Version 4 Linear Program software application by maximizing electrical energy production. The data used is the monthly inflow discharge into Cirata Reservoir for 23 years (2000-2022). For optimization needs, long data is needed so that the calculation of the generation discharge of the Thomas-fiering method is carried out, the data is generated until 2045, besides that evaporation data, reservoir technical data, and hydropower installation data are needed. Optimization of turbines operated is assumed to be 2 turbines for dry years and 3 turbines for wet years and normal years, simulations are grouped into 3 conditions, namely wet season conditions Q20% with 20% reliability, normal conditions Q50% with 50% reliability, and dry season conditions Q80% with 80% reliability. The results of optimizing hydropower operations are 1,119,061.6 MWh per year in the dry year (80%) reduced by 18.82% compared to the existing electric power, for the normal year the electricity production is 1,539,500.8 MWh per year up 11.6%, and for the wet year the electricity production is 2,027,108.7 MWh up 47.05%. While the existing electricity production of Cirata Hydroelectric Power Plant is 1,378,434.21 MWh. In addition, there is a decrease in the effective volume of the Cirata reservoir, in 2007 the effective volume of the reservoir was 837.51 million m3, while in 2022 the effective volume of the reservoir was 782.6 million m3.

Item Type: Thesis (S1)
Additional Information: https://scholar.google.com/citations?view_op=new_profile&hl=en ID SINTA Dosen Pembimbing: Rakmat Yusuf: 6003508
Uncontrolled Keywords: Waduk, Inflow, PLTA, Operasi, Optimasi Reservoir, Inflow, Hydroelectric Power Plants, Operation, Optimization
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TJ Mechanical engineering and machinery
Divisions: Fakultas Pendidikan Teknik dan Industri > Jurusan Pendidikan Teknik Sipil > Program Studi Teknik Sipil
Depositing User: Putri Luthfi Alifidia
Date Deposited: 05 Nov 2024 08:32
Last Modified: 05 Nov 2024 08:32
URI: http://repository.upi.edu/id/eprint/127066